Skip to content

Prepare for 0.1.0 release: add ruff, fix CI, unit tests, and changelog #1

Prepare for 0.1.0 release: add ruff, fix CI, unit tests, and changelog

Prepare for 0.1.0 release: add ruff, fix CI, unit tests, and changelog #1

Triggered via push February 16, 2026 13:32
Status Failure
Total duration 24s
Artifacts

publish.yml

on: push
Matrix: ci / build
publish
publish
Fit to window
Zoom out
Zoom in

Annotations

7 errors
ci / build (3.11)
Process completed with exit code 1.
ci / build (3.13)
The strategy configuration was canceled because "ci.build._3_11" failed
ci / build (3.13)
The operation was canceled.
ci / build (3.10)
The strategy configuration was canceled because "ci.build._3_11" failed
ci / build (3.10)
The operation was canceled.
ci / build (3.12)
The strategy configuration was canceled because "ci.build._3_11" failed
ci / build (3.12)
The operation was canceled.