Skip to content

cffi: update to use libyang v4.2.2 #600

cffi: update to use libyang v4.2.2

cffi: update to use libyang v4.2.2 #600

Triggered via pull request November 3, 2025 12:04
Status Failure
Total duration 50s
Artifacts

ci.yml

on: pull_request
Matrix: test
check-commits
8s
check-commits
coverage
36s
coverage
Fit to window
Zoom out
Zoom in

Annotations

13 errors
test (3.12, py312)
Process completed with exit code 1.
test (3.13, py313)
The strategy configuration was canceled because "test._3_12_py312" failed
test (3.13, py313)
Process completed with exit code 1.
test (3.10, py310)
The strategy configuration was canceled because "test._3_12_py312" failed
test (3.10, py310)
Process completed with exit code 1.
test (3.9, py39)
The strategy configuration was canceled because "test._3_12_py312" failed
test (3.9, py39)
Process completed with exit code 1.
test (3.11, py311)
The strategy configuration was canceled because "test._3_12_py312" failed
test (3.11, py311)
The operation was canceled.
coverage
Process completed with exit code 1.
lint
Process completed with exit code 1.
test (pypy3.9, pypy3)
The strategy configuration was canceled because "test._3_12_py312" failed
test (pypy3.9, pypy3)
The operation was canceled.