Review and revision lanes below are the planned v0.1 operating contract. Their routes and jobs remain unavailable until the owning REV chunks, exact AUTH activation, and REV-13 joint release complete.
The queue is the operational truth of Workstream. It tells the team what exists, what is blocked, what needs human action, and what creates contribution or compensation-award exposure.
Queue lanes must be derived from task status, not manually maintained in separate lists.
Tasks being prepared.
Owner:
- project manager
- task creator
Exit requirement:
- project guide attached
- acceptance criteria present
- required output defined
Tasks that look ready but need independent release review before contributors can claim them.
Owner:
- project manager
- reviewer lead
- quality lead
Exit requirement:
- project guide version locked
- immutable guide source snapshot id/hash locked
- acceptance criteria are concrete
- effective project submission artifact policy hash locked
- project
PreSubmitCheckerPolicycompiled bundle hash locked - approved generated project
PostSubmitCheckerPolicyis locked with matching guide, source snapshot, effective project policy, and pre-submit checker provenance - review policy is attached
- revision policy is attached
- no open critical- or high-severity readiness finding
Policy:
- screening is where weak task guides and low-quality task specs fail
- contributors do not see tasks that have not passed screening
Tasks that can be claimed or assigned.
Owner:
- project manager
Exit requirement:
- assigned or claimed by contributor
Tasks in CLAIMED or IN_PROGRESS.
Owner:
- contributor
- operator
Operational risk:
- stale active tasks block throughput
Policy:
- each active task must have a deadline or next check-in
- stale tasks get an owner action before deadline breach
Tasks with a new submission packet.
Owner:
- checker system
Exit requirement:
- checker run created
Checker run is active.
Owner:
- checker system
- Operator when infrastructure recovery is required
Policy:
- checker failure because of platform/tooling stays in checker retry handling;
Operator retry uses
operations.checker.retry, while covered Project Manager repair usesproject.task.manage, and neither moves work directly to review - retry and repair actions record matched grant/permission, reason, attempt, and immutable audit history
Mandatory automated admission after post-submit checks and before human review.
Owner:
- checker system
Policy:
- only a durable, final, current
CheckerRunoutcome ofallow_reviewadmits the exact immutable Submission - admission records the exact CheckerRun and verified binding facts; retries, superseded runs, and different Submissions cannot replace that anchor
- contributor-fixable checker failures may route the Task to
needs_revisionbut create no Review, ReviewFinding, or reviewer contribution - setup or provenance defects remain blocked until the owning covered repair or retry action succeeds
- human judgment begins only after admission and is recorded as an immutable Review
Submission passed blocking checks and is ready for human review.
Owner:
- reviewer
Policy:
- reviewer current work returns an active lease, one server-selected offer, or none; reviewers never browse the complete lane
- any critical- or high-severity checker failure in this lane is a system bug; no administrative grant can override it into review readiness
Contributor-facing lane for fixable issues from automated checks, pre-review gates, or human review.
Policy:
- after a human
needs_revisionReview, Workstream compares the prior Submission's complete governing context with the currently active applicable guide/source, submission/checker, review, revision, task-execution, and submitter ContributionPolicy context - exact component matches keep; every changed valid component rebases together; unsafe or incomplete context blocks the whole preparation for manager repair
- Task Context returns the frozen preparation and change summary; the reviewer never rebases the leased Submission
- out-of-band guidance is not enforceable until it is encoded into guide, policy, task template, or checker contracts
Owner:
- contributor
- covered Project Manager for planned repair/obligation closure; Operator only for evidence-linked legacy recovery
Policy:
- checker-caused remediation carries CheckerResult lineage; human-review revision carries an immutable Review and at least one blocking finding
- human-review resubmission includes one immutable response per unresolved blocking finding
Work satisfies the project guide and acceptance criteria.
Owner:
- project operations
- finance/reconciliation only for payable contribution awards
Policy:
- the accepting Review creates reviewer
completed_review, REV-owned FinalAcceptance, and FinalAcceptance-sourced submitteraccepted_submissioncontribution records atomically - each frozen contribution policy is evaluated independently; only payable contributions create awards and fulfillment follow-up
- accepted task is not confused with fulfilled compensation
Work is not acceptable and will not continue in the normal revision loop.
Owner:
- project manager for terminal-state observation
- authorized audit authority for non-mutating quality sampling only
Policy:
- rejection requires a bounded human, guide-grounded reason; structured findings and finalized evidence are optional when they add useful support
- the Task enters canonical
rejected; only its same-task TaskAssignment is blocked and bound to the reject Review - no FinalAcceptance or submitter contribution is created; no actor grant or unrelated task changes
- quality sampling cannot reopen, adjudicate, replace, or change the immutable Review, rejection, task state, assignment effect, or contribution lineage
Compensation follow-up is not a task queue lane. It is derived from payable
CompensationAward records and their fulfillment projections, whether the
source contribution is completed_review or accepted_submission.
Track:
- payable contribution missing its award or fulfillment projection
- pending award delivery
- acknowledged by adapter
- failed fulfillment
- fulfilled with immutable receipt
Every operating day starts with:
- count tasks by lane
- clear screening tasks or send them back to draft
- inspect stale active tasks
- clear checker failures
- monitor server-selected review offers and active leases
- push needs revision tasks to contributors
- reconcile payable awards with pending/failed fulfillment projections
- record new lessons learned
| Transition | Required Records |
|---|---|
DRAFT -> SCREENING |
project id, locked guide candidate, task source/description fields, acceptance and rejection criteria |
SCREENING -> READY |
screening decision, guide version lock, guide source snapshot id/hash lock, acceptance criteria, effective project submission artifact policy hash lock, project PreSubmitCheckerPolicy compiled bundle hash lock, approved generated project PostSubmitCheckerPolicy with matching provenance, review policy, revision policy, and immutable task-locked ContributionPolicyVersion |
READY -> CLAIMED |
TaskAssignment copies the task's exact locked_contribution_policy_version_id; no active-policy lookup |
IN_PROGRESS -> SUBMITTED |
blocking pre-submit checks passed against the exact outer ZIP, submission packet, server-generated submission-bundle manifest and verified admission binding, evidence references, contributor attestation |
SUBMITTED -> EVALUATION_PENDING |
immutable submission version, locked post-submit checker policy id/version/hash/body copied from the task context |
EVALUATION_PENDING -> REVIEW_PENDING |
durable, final, current CheckerRun for the exact Submission with outcome exactly allow_review, verified artifact bindings, no blocking failures |
EVALUATION_PENDING -> NEEDS_REVISION |
durable, final, current CheckerRun for the exact Submission with outcome exactly needs_revision, verified artifact bindings, outcome source auto_checker, contributor-visible checker failures with severity, message, suggested fix |
REVIEW_PENDING -> NEEDS_REVISION |
immutable Review, at least one blocking ReviewFinding, reviewer completed_review under the completed lease freeze, atomic complete-context kept/rebased/blocked preparation for the next attempt; no FinalAcceptance or submitter contribution |
REVIEW_PENDING -> ACCEPTED |
immutable accepting Review, FinalAcceptance, reviewer completed_review, submitter accepted_submission sourced from FinalAcceptance, applicable awards |
REVIEW_PENDING -> REJECTED |
immutable rejected Review, bounded reason, same-task assignment block, reviewer completed_review; no FinalAcceptance or submitter contribution |
NEEDS_REVISION -> SUBMITTED |
exact complete-context preparation head/digest, replacement Submission stamped with its selected guide/policy context, response for every unresolved blocking finding, policy limit/deadline not reached |
NEEDS_REVISION -> CANCELLED |
covered manager limit/deadline closure or Operator legacy-context closure, bounded canonical reason, assignment release; no synthetic Review or contribution |
compensation pending -> fulfilled |
immutable fulfillment receipt, external reference, and audit event |
Each project defines capacity limits:
- maximum active tasks per contributor
- maximum active ReviewLeases per reviewer
- maximum stale active age
- maximum pending/failed payable-award fulfillment age
Capacity limits prevent the queue from looking healthy while hidden work is stuck.
For early pilots, use conservative defaults:
- contributor active task limit: 2
- reviewer active ReviewLease limit: 1
- review SLA: 24 hours
- compensation fulfillment reconciliation SLA: daily
- tasks ready
- tasks screening
- tasks active
- submitted awaiting checks
- review pending age
- needs revision age
- unfulfilled compensation award amount
- rejected count
- fulfilled compensation total
Cause:
- not enough reviewers
- reviewers lack context
- checker output too noisy
Fix:
- assign reviewer owner
- improve review packet
- split projects by reviewer skill
Cause:
- vague feedback
- contributor not closing findings
- task spec unclear
Fix:
- require revision replay
- audit reviewer wording
- update project guide
Cause:
- contribution award creation and fulfillment are disconnected
Fix:
- frozen contribution policy evaluation creates awards only for payable contributions; explicit unpaid rules create none
- compensation fulfillment dashboard is reviewed daily
Cause:
- no ready gate
- task creator skipped project guide
- acceptance criteria are vague
Fix:
- run ready gate before
READY - add task creator checklist
- require reviewer simulation for first-of-kind tasks