Describe the bug
When I place Wind Turbine from Angel's Refining with Mouse-over Construction, it is not counted towards research progress.
To Reproduce
- Game Version: 1.1.107
- Modlist:
a. Angel's Refining: 0.12.7
b. Nullius 1.9.1
c. Mouse-over Constructio: 1.2.1
d. ...
- Craft Wind Turbine
- Disable RoboPort, so robots will not try to build it.
- Create ghost of Wind Turbine.
- Enable Mouse over.
- Move mouse over ghost of Wind Turbine.
- No progress for research Wind Power Demonstration.
Additional context
Posted bug also to Angel's Refining & Mouse-over Construction, because It's not taking building from inventory after placing it, so I can build infinite Wind Turbines ....
Save file
To sync all mods, research already done ...
Nullius 2nd start.zip
Describe the bug
When I place Wind Turbine from Angel's Refining with Mouse-over Construction, it is not counted towards research progress.
To Reproduce
a. Angel's Refining: 0.12.7
b. Nullius 1.9.1
c. Mouse-over Constructio: 1.2.1
d. ...
Additional context
Posted bug also to Angel's Refining & Mouse-over Construction, because It's not taking building from inventory after placing it, so I can build infinite Wind Turbines ....
Save file
To sync all mods, research already done ...
Nullius 2nd start.zip