Let us brainstorm about useful risk analyses procedures that can be built on top of the core model and the already existing spreadsheet outputs.
In other words:
- What are relevant risk KPIs and how can we express them for the token economy / stakeholders?
- Which KPIs can we leverage to determine the economic feasibility of a project or a certain input scenario?
- How do we want to present these risk related metrics?
- Do we want to work with safety margins? How would this look like?
Let us brainstorm about useful risk analyses procedures that can be built on top of the core model and the already existing spreadsheet outputs.
In other words: