Skip to content

Latest commit

 

History

History
47 lines (36 loc) · 1.9 KB

File metadata and controls

47 lines (36 loc) · 1.9 KB

Roadmap

SecureToolKit advances through explicitly approved security phases. A completed implementation phase is not automatically production-ready, and no phase may silently broaden the trust boundary.

Current status

Area Status
Phases 1–6 protocol Frozen at PROTOCOL_PHASE_1_6_FINAL
Phase 7 architecture Accepted at PHASE_7_ARCHITECTURE_FINAL
Phase 7 Swift implementation RC1 candidate present on main
Phase 7 conformance publication Candidate process; separate approval required
Public GitHub release In preparation
Production readiness Not approved

Completed implementation scope

  • Tool registry and immutable definition snapshots
  • Closed schema validation and canonical request representation
  • Authenticated intent, provenance, influence, and Host-boundary binding
  • Deterministic policy publication and evaluation
  • Structural Authorization issuance and pure validation
  • Bound human-confirmation lifecycle and confirmed Authorization validation

Release preparation

Before a public RC can be represented as a long-term baseline, release records, conformance status, supported platforms, security reporting, documentation, and the exact Git identity must agree. Candidate evidence must not represent itself as approved.

Later phases

Phase Intended scope Status
8 — Audit Privacy-minimized audit contracts and integrity semantics Not started
9 — Demo Separate Host-owned non-production integration Not started
10 — Release Final API, security, supply-chain, platform, and disclosure gates Not started

Phase 8 is not started by repository-publication work. Execution remains outside SecureToolKit in every phase.

The historical Phase 1–6 milestone plan remains available in docs/ROADMAP.md. The Phase 7 engineering program and gates are indexed in docs/README.md.