Skip to content

Update lefthook configuration to change pre-commit to prepare-commit-… #3

Update lefthook configuration to change pre-commit to prepare-commit-…

Update lefthook configuration to change pre-commit to prepare-commit-… #3

Re-run triggered August 29, 2025 08:12
Status Failure
Total duration 17s
Artifacts

main.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

7 errors
Ruby 3.1
The process '/opt/hostedtoolcache/Ruby/3.1.7/x64/bin/bundle' failed with exit code 5
Ruby 3.4
The operation was canceled.
Ruby 3.4
The strategy configuration was canceled because "build._3_1" failed
Ruby 3.2
The operation was canceled.
Ruby 3.2
The strategy configuration was canceled because "build._3_1" failed
Ruby 3.3
The operation was canceled.
Ruby 3.3
The strategy configuration was canceled because "build._3_1" failed