Skip to content

Merge pull request #91 from null8626/v1/api-rewrite #97

Merge pull request #91 from null8626/v1/api-rewrite

Merge pull request #91 from null8626/v1/api-rewrite #97

Triggered via push April 29, 2026 16:21
Status Failure
Total duration 25s
Artifacts

test.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

9 errors
build (3.14)
Process completed with exit code 2.
build (3.12)
The strategy configuration was canceled because "build._3_14" failed
build (3.12)
Process completed with exit code 2.
build (3.10)
The strategy configuration was canceled because "build._3_14" failed
build (3.10)
Process completed with exit code 2.
build (3.13)
The strategy configuration was canceled because "build._3_14" failed
build (3.13)
Process completed with exit code 2.
build (3.11)
The strategy configuration was canceled because "build._3_14" failed
build (3.11)
Process completed with exit code 2.