-
Notifications
You must be signed in to change notification settings - Fork 43
Open
Description
Hi,
I'm running CLIPer on a BAM file from one replicate of an ENCODE eCLIP experiment (--FDR 0.10, -s hg38, otherwise default params) using 8 cores. I'm curious what the average runtime of CLIPer is, as it's running for >12h now, occasionally throwing the warning below. Thanks!
The maximal number of iterations maxit (set to 20 by the program)
allowed for finding a smoothing spline with fp=s has been reached: s
too small.
There is an approximation returned but the corresponding weighted sum
of squared residuals does not satisfy the condition abs(fp-s)/s < tol.
warnings.warn(message)
Metadata
Metadata
Assignees
Labels
No labels