Notifications
You must be signed in to change notification settings - Fork 0
Expand file tree
/
Copy pathFull_Plan.plan
More file actions
64 lines (56 loc) · 1.39 KB
/
Copy pathFull_Plan.plan
File metadata and controls
64 lines (56 loc) · 1.39 KB
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
; Lift Station No.6 Schedule
project: DOTI LS6
- client: DOTI
- project_number: TBA
- description: Decommission LS6 and Install 18" Sewer
calendar: standard
start: 2026-09-20
finish: 2029-12-31
task 1 Project Management
- Owner: Design Team
- Description: Handle management of project including meetings and invoicing
task 1.1 Project Initiation 0d
task 1.2 PMP 2w
depends 1.1
- owner: Design Team
- description: Generate PMP and QMP and Schedule after initiation meetings
task 3 Site Characterization
task 3.1 SUE 2w
depends 1.1 +2w
task 3.2 Survey 6w
depends 1.1 +7d
depends 3.1 2w
task 3.3 Geotech 56d
depends 3.4 SS +1w
task 3.4 Environmental 8w
depends 1.1 FS +7d
task 4 Evaluation and Design
task 4.1 Prelim Eng
task 4.1.1 Alt Analysis 16w
depends 1.1
task 4.1.2 Engineering Report 6w
depends 4.1.1
- description: Prepare report with intent to submit to CDPHE
task 4.2 Design
task 4.2.1 30% 98d
depends 4.1.2
task 4.2.2 60% 112d
depends 4.2.1 FS
task 4.2.3 90% 140d
depends 4.2.2 FS 0d
task 4.2.4 Final 20w
depends 4.2.3
; Add tasks 4.3+ and 5/6 later
; Tracking
2026-01-01
1.1 start
1.2 start
2026-01-05 1.1 progress 30%
2026-01-06 1.2 progress +50%
2025-12-15 3.2 start
2026-09-10
3.1 start
3.1 progress 50%
1.2 progress +50%
2026-09-01 1.1 complete
2026-10-11 1.2 note This is a note for task 1.2