update completely to 0.8.0.rc4 #1472
test.yml
on: push
Docker smoke test
22s
Matrix: test
Annotations
7 errors
|
Ruby 3.4
The process '/opt/hostedtoolcache/Ruby/3.4.9/x64/bin/bundle' failed with exit code 6
|
|
Ruby 3.3
The strategy configuration was canceled because "test._3_4" failed
|
|
Ruby 3.3
Process completed with exit code 1.
|
|
Ruby 4.0
The strategy configuration was canceled because "test._3_4" failed
|
|
Ruby 4.0
The operation was canceled.
|
|
Ruby 3.2
The strategy configuration was canceled because "test._3_4" failed
|
|
Ruby 3.2
The operation was canceled.
|