Skip to content

Merge pull request #28 from ansman/patch-1 #131

Merge pull request #28 from ansman/patch-1

Merge pull request #28 from ansman/patch-1 #131

Triggered via push August 28, 2026 20:14
Status Failure
Total duration 15s
Artifacts

ci.yml

on: push
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

7 errors
test (3.13)
Process completed with exit code 1.
test (3.10)
The strategy configuration was canceled because "test._3_13" failed
test (3.10)
Process completed with exit code 1.
test (3.12)
The strategy configuration was canceled because "test._3_13" failed
test (3.12)
The operation was canceled.
test (3.11)
The strategy configuration was canceled because "test._3_13" failed
test (3.11)
The operation was canceled.