The problem is if my run was stopped midway, due shut down of HPC or system..
i cannot resume the chains,
if i restart the run,
new chains are created.. what i want is to resume the old or original chains..
i have tried a lot, is there any way??? or not??
The problem is if my run was stopped midway, due shut down of HPC or system..
i cannot resume the chains,
if i restart the run,
new chains are created.. what i want is to resume the old or original chains..
i have tried a lot, is there any way??? or not??