Skip to content

chore(deps): update all non-major dependencies #5568

chore(deps): update all non-major dependencies

chore(deps): update all non-major dependencies #5568

Re-run triggered April 3, 2026 17:36
Status Cancelled
Total duration 1d 0h 0m 9s
Artifacts 21

integration_test.yaml

on: pull_request
Cross controller integration test using private-endpoint  /  Plan
8s
Cross controller integration test using private-endpoint / Plan
Integration test using private-endpoint  /  Plan
8s
Integration test using private-endpoint / Plan
Matrix: Runner tests across bases
Matrix: Cross controller integration test using private-endpoint / build
Matrix: Cross controller integration test using private-endpoint / Integration tests / Integration tests
Matrix: Integration test using private-endpoint / build
Matrix: Integration test using private-endpoint / Integration tests / Integration tests
Cross controller integration test using private-endpoint  /  Plan Image Scanning
5s
Cross controller integration test using private-endpoint / Plan Image Scanning
Integration test using private-endpoint  /  Plan Image Scanning
4s
Integration test using private-endpoint / Plan Image Scanning
Matrix: Cross controller integration test using private-endpoint / scan
Matrix: Integration test using private-endpoint / scan
Cross controller integration test using private-endpoint  /  Required Integration Test Status Checks
2s
Cross controller integration test using private-endpoint / Required Integration Test Status Checks
Integration test using private-endpoint  /  Required Integration Test Status Checks
2s
Integration test using private-endpoint / Required Integration Test Status Checks
allure-report  /  Publish Allure report
allure-report / Publish Allure report
Fit to window
Zoom out
Zoom in

Annotations

6 errors
Integration test using private-endpoint / Integration tests / Integration tests (test_charm_fork_path_change)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
Runner tests across bases (22.04) / Integration tests / Integration tests (test_charm_runner)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
Cross controller integration test using private-endpoint / Integration tests / Integration tests (test_prometheus_metrics)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
Integration test using private-endpoint / Required Integration Test Status Checks
Process completed with exit code 1.
Runner tests across bases (22.04) / Required Integration Test Status Checks
Process completed with exit code 1.