integration-tests #34
integration_test.yaml
on: schedule
Integration test using private-endpoint
/
Plan
6s
openstack interface test using private-endpoint
/
Plan
5s
Matrix: Integration test using private-endpoint / build
Matrix: openstack interface test using private-endpoint / build
Integration test using private-endpoint
/
Plan Image Scanning
0s
Matrix: Integration test using private-endpoint / Integration tests / Integration tests
Waiting for pending jobs
openstack interface test using private-endpoint
/
Plan Image Scanning
0s
Matrix: openstack interface test using private-endpoint / Integration tests / Integration tests
Waiting for pending jobs
Matrix: Integration test using private-endpoint / scan
Matrix: openstack interface test using private-endpoint / scan
Integration test using private-endpoint
/
Required Integration Test Status Checks
2s
openstack interface test using private-endpoint
/
Required Integration Test Status Checks
3s
allure-report
/
Publish Allure report
1m 6s
Annotations
3 errors
|
openstack interface test using private-endpoint / Plan
Process completed with exit code 128.
|
|
Integration test using private-endpoint / Plan
Process completed with exit code 128.
|
|
allure-report / Publish Allure report
The process '/usr/bin/git' failed with exit code 1
|
Artifacts
Produced during runtime
| Name | Size | Digest | |
|---|---|---|---|
|
2025-07-08T18-04-20-99be__plan
Expired
|
299 Bytes |
sha256:f5af9cde476961fdfd355ab227e608572a9c9956468132a6d625d572d24b20bc
|
|
|
2025-07-08T18-04-21-a127__plan
Expired
|
298 Bytes |
sha256:0cb4878cc14d8857cdb68434d807394032a9ed31355cd7daaf3b92b422ee7dda
|
|