integration-tests #35
integration_test.yaml
on: schedule
Integration test using private-endpoint
/
Plan
6s
openstack interface test using private-endpoint
/
Plan
9s
Matrix: Integration test using private-endpoint / build
Matrix: openstack interface test using private-endpoint / build
Integration test using private-endpoint
/
Plan Image Scanning
0s
Matrix: Integration test using private-endpoint / Integration tests / Integration tests
Waiting for pending jobs
openstack interface test using private-endpoint
/
Plan Image Scanning
0s
Matrix: openstack interface test using private-endpoint / Integration tests / Integration tests
Waiting for pending jobs
Matrix: Integration test using private-endpoint / scan
Matrix: openstack interface test using private-endpoint / scan
Integration test using private-endpoint
/
Required Integration Test Status Checks
2s
openstack interface test using private-endpoint
/
Required Integration Test Status Checks
4s
allure-report
/
Publish Allure report
46s
Annotations
3 errors
|
Integration test using private-endpoint / Plan
Process completed with exit code 128.
|
|
openstack interface test using private-endpoint / Plan
Process completed with exit code 128.
|
|
allure-report / Publish Allure report
The process '/usr/bin/git' failed with exit code 1
|
Artifacts
Produced during runtime
| Name | Size | Digest | |
|---|---|---|---|
|
2025-07-09T06-04-58-a1a9__plan
Expired
|
299 Bytes |
sha256:87427bcb4693f0c0b18722aa2ea737a2fc9155b82492222bca0bffd1b9a1558a
|
|
|
2025-07-09T06-05-00-abc0__plan
Expired
|
298 Bytes |
sha256:728063f5923fab822d5bb13691f3471311a52e703b403db01f1c822c533710b5
|
|