integration-tests #47
integration_test.yaml
on: schedule
Integration test using private-endpoint
/
Plan
10s
openstack interface test using private-endpoint
/
Plan
10s
Matrix: Integration test using private-endpoint / build
Matrix: openstack interface test using private-endpoint / build
Integration test using private-endpoint
/
Plan Image Scanning
0s
Matrix: Integration test using private-endpoint / Integration tests / Integration tests
Waiting for pending jobs
openstack interface test using private-endpoint
/
Plan Image Scanning
0s
Matrix: openstack interface test using private-endpoint / Integration tests / Integration tests
Waiting for pending jobs
Matrix: Integration test using private-endpoint / scan
Matrix: openstack interface test using private-endpoint / scan
Integration test using private-endpoint
/
Required Integration Test Status Checks
2s
openstack interface test using private-endpoint
/
Required Integration Test Status Checks
2s
allure-report
/
Publish Allure report
59s
Annotations
3 errors
|
Integration test using private-endpoint / Plan
Process completed with exit code 128.
|
|
openstack interface test using private-endpoint / Plan
Process completed with exit code 128.
|
|
allure-report / Publish Allure report
The process '/usr/bin/git' failed with exit code 1
|
Artifacts
Produced during runtime
| Name | Size | Digest | |
|---|---|---|---|
|
2025-07-15T06-05-06-8b89__plan
Expired
|
299 Bytes |
sha256:45b573d8fbe7c47073c5ed0f2d8a639c0e6197353491b94aeda5546f910b3a43
|
|
|
2025-07-15T06-05-08-a491__plan
Expired
|
299 Bytes |
sha256:8fd3dafaf9f03a28f1d501c53878ded5206151eaaaf0e57a564a7bedc3e3715a
|
|