integration-tests #53
integration_test.yaml
on: schedule
Integration test using private-endpoint
/
Plan
5s
openstack interface test using private-endpoint
/
Plan
5s
Matrix: Integration test using private-endpoint / build
Matrix: openstack interface test using private-endpoint / build
Integration test using private-endpoint
/
Plan Image Scanning
0s
Matrix: Integration test using private-endpoint / Integration tests / Integration tests
Waiting for pending jobs
openstack interface test using private-endpoint
/
Plan Image Scanning
0s
Matrix: openstack interface test using private-endpoint / Integration tests / Integration tests
Waiting for pending jobs
Matrix: Integration test using private-endpoint / scan
Matrix: openstack interface test using private-endpoint / scan
Integration test using private-endpoint
/
Required Integration Test Status Checks
4s
openstack interface test using private-endpoint
/
Required Integration Test Status Checks
2s
allure-report
/
Publish Allure report
58s
Annotations
3 errors
|
Integration test using private-endpoint / Plan
Process completed with exit code 128.
|
|
openstack interface test using private-endpoint / Plan
Process completed with exit code 128.
|
|
allure-report / Publish Allure report
The process '/usr/bin/git' failed with exit code 1
|
Artifacts
Produced during runtime
| Name | Size | Digest | |
|---|---|---|---|
|
2025-07-18T06-04-56-9970__plan
Expired
|
299 Bytes |
sha256:c9f123cfe8187e5f5d3008312e599c9e87132ad34d5e015efeceba3427732e9d
|
|
|
2025-07-18T06-04-56-b70f__plan
Expired
|
299 Bytes |
sha256:0e44978186dce503ad97f623bf3210fa76a6e4d3fa5355f1c5b7a2d70e8163e2
|
|