Skip to content

integration-tests

integration-tests #96

Triggered via schedule August 8, 2025 18:04
Status Cancelled
Total duration 1d 2h 25m 33s
Artifacts 4

integration_test.yaml

on: schedule
Integration test using private-endpoint  /  Plan
8s
Integration test using private-endpoint / Plan
openstack interface test using private-endpoint  /  Plan
8s
openstack interface test using private-endpoint / Plan
Matrix: Integration test using private-endpoint / build
Matrix: openstack interface test using private-endpoint / build
Integration test using private-endpoint  /  Plan Image Scanning
7s
Integration test using private-endpoint / Plan Image Scanning
Matrix: Integration test using private-endpoint / Integration tests / Integration tests
openstack interface test using private-endpoint  /  Plan Image Scanning
6s
openstack interface test using private-endpoint / Plan Image Scanning
Matrix: openstack interface test using private-endpoint / Integration tests / Integration tests
Matrix: Integration test using private-endpoint / scan
Matrix: openstack interface test using private-endpoint / scan
Integration test using private-endpoint  /  Required Integration Test Status Checks
0s
Integration test using private-endpoint / Required Integration Test Status Checks
openstack interface test using private-endpoint  /  Required Integration Test Status Checks
0s
openstack interface test using private-endpoint / Required Integration Test Status Checks
allure-report  /  Publish Allure report
allure-report / Publish Allure report
Fit to window
Zoom out
Zoom in

Annotations

15 errors
Integration test using private-endpoint / Integration tests / Integration tests (test_charm_upgrade)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
Integration test using private-endpoint / Integration tests / Integration tests (test_jobmanager_reactive)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
Integration test using private-endpoint / Integration tests / Integration tests (test_charm_metrics_success)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
Integration test using private-endpoint / Integration tests / Integration tests (test_debug_ssh)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
Integration test using private-endpoint / Integration tests / Integration tests (test_jobmanager_prespawned)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
Integration test using private-endpoint / Integration tests / Integration tests (test_charm_metrics_failure)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
Integration test using private-endpoint / Integration tests / Integration tests (test_charm_no_runner)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
Integration test using private-endpoint / Integration tests / Integration tests (test_charm_fork_repo)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
Integration test using private-endpoint / Integration tests / Integration tests (test_charm_runner)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
Integration test using private-endpoint / Integration tests / Integration tests (test_reactive)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
Integration test using private-endpoint / Integration tests / Integration tests (test_charm_fork_path_change)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
openstack interface test using private-endpoint / Integration tests / Integration tests (test_runner_manager_openstack)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
integration-tests
Canceling since a higher priority waiting request for integration-tests-refs/heads/main exists
integration-tests
Canceling since a higher priority waiting request for integration-tests-refs/heads/main exists
integration-tests
Canceling since a higher priority waiting request for integration-tests-refs/heads/main exists

Artifacts

Produced during runtime
Name Size Digest
2025-08-08T20-15-51-b19b__build__output__charm__github-runner Expired
28.7 MB
sha256:c71d356f32828c9c142324ef5feb9e20d4ec83ad8c6b4f360204f528786fdf3b
2025-08-08T20-15-51-b19b__plan Expired
298 Bytes
sha256:9d6b45e81f71119ab62a575c99eb981204f354eff877104840b0c24f3e544004
2025-08-08T20-15-52-a422__build__output__charm__github-runner Expired
28.7 MB
sha256:a74b651fbb69b871f96395934310138195d9b8afc9a71153acf9282c8ab34f36
2025-08-08T20-15-52-a422__plan Expired
298 Bytes
sha256:0bdd4a3678f901544a73baff873268c64ae0d416bb5d0e494bf16ae2ab5b6a8d