Skip to content

integration-tests

integration-tests #112

Triggered via schedule August 16, 2025 18:04
Status Cancelled
Total duration 1d 4h 20m 15s
Artifacts 4

integration_test.yaml

on: schedule
Integration test using private-endpoint  /  Plan
7s
Integration test using private-endpoint / Plan
openstack interface test using private-endpoint  /  Plan
10s
openstack interface test using private-endpoint / Plan
Matrix: Integration test using private-endpoint / build
Matrix: openstack interface test using private-endpoint / build
Integration test using private-endpoint  /  Plan Image Scanning
6s
Integration test using private-endpoint / Plan Image Scanning
Matrix: Integration test using private-endpoint / Integration tests / Integration tests
openstack interface test using private-endpoint  /  Plan Image Scanning
6s
openstack interface test using private-endpoint / Plan Image Scanning
Matrix: openstack interface test using private-endpoint / Integration tests / Integration tests
Matrix: Integration test using private-endpoint / scan
Matrix: openstack interface test using private-endpoint / scan
Integration test using private-endpoint  /  Required Integration Test Status Checks
0s
Integration test using private-endpoint / Required Integration Test Status Checks
openstack interface test using private-endpoint  /  Required Integration Test Status Checks
0s
openstack interface test using private-endpoint / Required Integration Test Status Checks
allure-report  /  Publish Allure report
allure-report / Publish Allure report
Fit to window
Zoom out
Zoom in

Annotations

15 errors
openstack interface test using private-endpoint / Integration tests / Integration tests (test_runner_manager_openstack)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
Integration test using private-endpoint / Integration tests / Integration tests (test_charm_fork_repo)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
Integration test using private-endpoint / Integration tests / Integration tests (test_debug_ssh)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
Integration test using private-endpoint / Integration tests / Integration tests (test_charm_runner)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
Integration test using private-endpoint / Integration tests / Integration tests (test_charm_fork_path_change)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
Integration test using private-endpoint / Integration tests / Integration tests (test_charm_no_runner)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
Integration test using private-endpoint / Integration tests / Integration tests (test_charm_metrics_failure)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
Integration test using private-endpoint / Integration tests / Integration tests (test_reactive)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
Integration test using private-endpoint / Integration tests / Integration tests (test_jobmanager_prespawned)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
Integration test using private-endpoint / Integration tests / Integration tests (test_charm_metrics_success)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
Integration test using private-endpoint / Integration tests / Integration tests (test_charm_upgrade)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
Integration test using private-endpoint / Integration tests / Integration tests (test_jobmanager_reactive)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
integration-tests
Canceling since a higher priority waiting request for integration-tests-refs/heads/main exists
integration-tests
Canceling since a higher priority waiting request for integration-tests-refs/heads/main exists
integration-tests
Canceling since a higher priority waiting request for integration-tests-refs/heads/main exists

Artifacts

Produced during runtime
Name Size Digest
2025-08-16T22-09-37-a059__build__output__charm__github-runner Expired
28.7 MB
sha256:3f3fa321b53b690d39d614b6b37802b8825e8884a9ede79598848295d4e27993
2025-08-16T22-09-37-a059__plan Expired
299 Bytes
sha256:ddb8b5d69ce10270a4e78ef724fa7f03552b6daaa3bbf5651d34a2f173923b29
2025-08-16T22-09-42-8305__build__output__charm__github-runner Expired
28.7 MB
sha256:2abb43740f7138496c4220a5a610621c78474eaf846e9ddb21ac4e7af12393ec
2025-08-16T22-09-42-8305__plan Expired
299 Bytes
sha256:7ea6f5403145c76a77a0a57575443395d813daa6156dbf3c169667f2624f249c