Skip to content

integration-tests

integration-tests #157

Triggered via schedule March 3, 2026 06:10
Status Cancelled
Total duration 1d 11h 57m 47s
Artifacts 4

integration_test.yaml

on: schedule
Cross controller integration test using private-endpoint  /  Plan
6s
Cross controller integration test using private-endpoint / Plan
Integration test using private-endpoint  /  Plan
10s
Integration test using private-endpoint / Plan
Matrix: Runner tests across bases
Matrix: Cross controller integration test using private-endpoint / build
Matrix: Cross controller integration test using private-endpoint / Integration tests / Integration tests
Matrix: Integration test using private-endpoint / build
Matrix: Integration test using private-endpoint / Integration tests / Integration tests
Cross controller integration test using private-endpoint  /  Plan Image Scanning
0s
Cross controller integration test using private-endpoint / Plan Image Scanning
Integration test using private-endpoint  /  Plan Image Scanning
Integration test using private-endpoint / Plan Image Scanning
Matrix: Cross controller integration test using private-endpoint / scan
Matrix: Integration test using private-endpoint / scan
Cross controller integration test using private-endpoint  /  Required Integration Test Status Checks
Cross controller integration test using private-endpoint / Required Integration Test Status Checks
Integration test using private-endpoint  /  Required Integration Test Status Checks
0s
Integration test using private-endpoint / Required Integration Test Status Checks
allure-report  /  Publish Allure report
allure-report / Publish Allure report
Fit to window
Zoom out
Zoom in

Annotations

23 errors
Integration test using private-endpoint / Build charm (github-runner)
Canceling since a higher priority waiting request for integration-tests-refs/heads/main exists
Integration test using private-endpoint / Build charm (github-runner)
The operation was canceled.
Runner tests across bases (22.04) / Build charm (github-runner)
Canceling since a higher priority waiting request for integration-tests-refs/heads/main exists
Runner tests across bases (22.04) / Build charm (github-runner)
The operation was canceled.
Runner tests across bases (24.04) / Build charm (github-runner)
Canceling since a higher priority waiting request for integration-tests-refs/heads/main exists
Runner tests across bases (24.04) / Build charm (github-runner)
The operation was canceled.
Cross controller integration test using private-endpoint / Build charm (github-runner)
Canceling since a higher priority waiting request for integration-tests-refs/heads/main exists
Cross controller integration test using private-endpoint / Integration tests / Integration tests (test_prometheus_metrics)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
Runner tests across bases (24.04) / Integration tests / Integration tests (test_charm_runner)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
Runner tests across bases (22.04) / Integration tests / Integration tests (test_charm_runner)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
Integration test using private-endpoint / Integration tests / Integration tests (test_reactive)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
Integration test using private-endpoint / Integration tests / Integration tests (test_charm_metrics_failure)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
Integration test using private-endpoint / Integration tests / Integration tests (test_charm_no_runner)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
Integration test using private-endpoint / Integration tests / Integration tests (test_charm_upgrade)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
Integration test using private-endpoint / Integration tests / Integration tests (test_charm_metrics_success)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
Integration test using private-endpoint / Integration tests / Integration tests (test_charm_fork_path_change)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
Integration test using private-endpoint / Integration tests / Integration tests (test_multi_unit_same_machine)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
integration-tests
Canceling since a higher priority waiting request for integration-tests-refs/heads/main exists
integration-tests
Canceling since a higher priority waiting request for integration-tests-refs/heads/main exists
integration-tests
Canceling since a higher priority waiting request for integration-tests-refs/heads/main exists
integration-tests
Canceling since a higher priority waiting request for integration-tests-refs/heads/main exists
integration-tests
Canceling since a higher priority waiting request for integration-tests-refs/heads/main exists

Artifacts

Produced during runtime
Name Size Digest
2026-03-03T18-08-33-8b9a__plan Expired
299 Bytes
sha256:8928bee07d09f7e98189adedf6c1d0c3fff00d091e1d9facebafb0e02e42e7bc
2026-03-03T18-08-34-999a__plan Expired
299 Bytes
sha256:727f85801088d50497310fe2be33efc1b936263755ba3b40f3c2bb1125249235
2026-03-03T18-08-35-8bff__plan Expired
299 Bytes
sha256:bf6641d5945b492f5f2dc5ba275d6e56dec3d44339f2dd582f0bbce53cac0b3f
2026-03-03T18-08-35-b0a1__plan Expired
298 Bytes
sha256:e3c4027e1eece381ac59d163f0492117268cc96977d3ad1f216a911853f28125