The top-level metrology needs document explains that the last number in the MPD numbering scheme is the current revision of the document.
However, in the industrial MPDs, the D.08.. and D.09.. MPDs use the last digit to denote entirely different documents. The semantic versioning ought to be consistent throughout.
https://github.com/ftessier/cirms/blob/a6335092cee24bb4609c7fdc7875f62e61c4f5c0/needs-report/metrology-needs/industrial-material/industrial-material.md?plain=1#L92-L96
The top-level metrology needs document explains that the last number in the MPD numbering scheme is the current revision of the document.
However, in the industrial MPDs, the
D.08..andD.09..MPDs use the last digit to denote entirely different documents. The semantic versioning ought to be consistent throughout.https://github.com/ftessier/cirms/blob/a6335092cee24bb4609c7fdc7875f62e61c4f5c0/needs-report/metrology-needs/industrial-material/industrial-material.md?plain=1#L92-L96