This guide contains the step-by-step process to complete an EPP release and assumes that you have an IDE provisioned using the Oomph setup.
Before copying this file to create a new issue titled EPP 2026-06 M1 with label endgame, update the names and versions, including those in this document.
To update names and versions, edit org.eclipse.epp.releng.updater.Updater to set the values of MILESTONE, PLATFORM_VERSION, and possibly EXECUTION_ENVIRONMENT to the current appropriate values.
Use the Run toolbar button drop-down menu to launch the Update Versions launch configuration to apply all the necessary name and version changes.
Or use the Run toolbar button drop-down menu to launch the Open Issue launch configuration to apply all the necessary name and version changes, and to open a new properly-titled, properly-labeled issue; the body text is too long to automatically create the body of the issue, but that text is copied to the system clipboard, so you can use simply paste it into the body.
The individual releases are tracked with endgame issues on GitHub.
For each release (M1, M2, M3, RC1, RC2) an endgame ticket is created with the appropriate contents from the rest of this document:
Check for bad links to issues (and other things) especially in epp.website.xml.
Make sure any outstanding reviews are progressing, e.g., create progress review, get PMC approval, etc.
Annual progress review is normally done in early June.
Ensure that the CI build is green. Resolving non-green builds will require tracking down problems and incompatibilities across all Eclipse participating projects. The simrel-dev mailing list is a good place to start when tracking such problems.
Check that packages containing incubating projects have that information reflected in Help -> About dialog. See near the end of the build output for a report of check-incubating.sh script.
This item is not currently done per milestone/release because for a while now all packages contain incubating components and until TM4E moves out of incubation this step is redundant.
The incubating indication should appear in feature.properties description, plugin.xml's product aboutText and about.propertiesblurb. In the past -incubation had to appear in the file name and (includes Incubating components) had to appear in packageMetaData. See Bug 564214 for documentation/votes on decision making.
On RC1 check "new and noteworthy" version numbers. If any N&N are out of date, remove the N&N entries and notify the corresponding package maintainer.
Search for url= (notice the blank before url) in epp.website.xml to see which ones are contained in the different packages.
Remember that some of the features will release new versions together with the new Eclipse release. Therefore using the currently released version number may be wrong. Look at the news links in 2026-06 Participants.
Synchronize the following - Remember to check the branch; these links are to master, but around RC2 master may be set up for the next release already.
Synchronize any changes to platform.product into all the epp.product files.
Synchronize any changes to platform.p2.inf into all the *.product/p2.inf files.
Synchronize any changes to platform's icons into icons root directory.
Update SIMREL_REPO in releng/org.eclipse.epp.config/parent/pom.xml if not done above.
Or use the Run toolbar button drop-down menu to launch the Update to Milestone Repository launch configuration. This will automatically determine the correct update site URL and will create an appropriate commit message in the system clipboard.
Update the build qualifiers to ensure that packages are all updated. See this gerrit for an example. Commit all other changes before this step because this step will automatically create a Git commit specifically for the forced qualifier changes. Use the External Tools toolbar drop-down menu to launch the Update Qualifiers launch configuration. This runs the setGitDate bash script. This script will make a local commit you need to push; do not amend it because the timestamp is relevant.
In some cases a respin/rebuild is needed and setGitDate needs to be run again. In that case you may need to manually add a minute or two to the applied timestamp in the script.
If the build fails there may be the opportunity to continue the build rather than restart it. This is relatively underused option but enabled by the multi-step Jenkins build in the Jenkinsfile. For example, running the build with the previously successful steps commented out can produce a build.
Disable the CI build so that the build results are not overwritten while doing the promotion. You can disable the project once it has fully started running; you don't have to wait for the build to finish.
Check that there are no warnings in the console output. Especially look for warnings about failure to sign.
If warnings about signing occur that leave the DMG unsigned and the build does not fail, please reopen Bug 567916.
Run the Notarize MacOSX Downloads CI job to notarize DMG packages on download.eclipse.org. This can be done after promotion if time is tight or the notarization fails repeatedly.See Bug 571669 for an example of failures.
Check the build script output to make sure that the curl calls were successful, e.g., no curl: (92) HTTP/2 stream 0 was not closed cleanly: INTERNAL_ERROR (err 2) messages. If there is an error like the above, the .dmg file that is copied to download.eclipse.org is corrupt. Run notarize-prepare-to-redo to rename the -signed file back to -tonotarize and then re-run the notarize job job.
Other notes about notarization
NOTE It seems perfectly normal that the notarize job needs to be run multiple times because many notarization attempts fail due to 500 and 000 response codes from the notarization server. See Bug 571669
NOTE Sometimes the notarization server has an error that causes a failure that requires Webmaster support. Error looks like "an existing transporter instance is currently uploading this package". To resolve, request assistance in Bug 573875 like what was done in Comment 11 of that bug. TODO: it may be possible to work around this error by always using a different random ID when doing the notarization.
Sanity check the build for the following:
Use the External Tools toolbar button drop-down menu to launch the Prepare Staging Sanity Check launch configuration.
This will automatically download the packages specified in the launch configuration to subfolders in /org.eclipse.epp.packages/sanity-check to make the follow steps easier.
Make sure filenames contain expected build name and milestone, e.g., 2026-06-M1.
Splash screen says the expected release name with no milestone, e.g., 2026-06.
Help -> About says the expected build name and milestone, e.g., 2026-06-M1.
From the Console, open the Host OSGi console and use ss -s INSTALLED to verify that there are no bundles failing to resolve.
The org.eclipse.epp.package.* features and bundles have the timestamp of the forced qualifier update or later.
Upgrade from previous release works. The Prepare Staging Sanity Check automatically configures the available updates sites for this test. To test the upgrade an equivalent to the simrel release composite site needs to be done. Add the following software sites to available software, check for updates and then make sure stuff works. In particular check error log and that core features, e.g., JDT, Platform, have been upgraded.
https://download.eclipse.org/staging/2026-06/ - NOTE Use SIMREL_REPO if the staging repo has been updated since the SIMREL_REPO location was created.
https://download.eclipse.org/justj/epp/milestone/latest -
This is needed when there is a new version of JustJ that is not also published as a release. For example, Java 21 between 2024-06 M1 and release date of 2024-06.
Edit Jenkins Build Information and name it, e.g., 2026-06 M1.
Run the Promote a Build CI job to prepare build artifacts and copy them to download.eclipse.org.
Optional - useful when testing changes to the promotion scripts: Run the build once in DRY_RUN mode to ensure that the output is correct before it is copied to download.eclipse.org.
This used to be done late in the day to try and reduce impact of adding dozens of GB on the download server and having all the mirrors start to pick it up right away. See epp-dev emails that led to this decision. However in 2024 the impact seems to no longer be a concern. This note is preserved until we know for sure there is no issue.
The DRY_RUN can be done earlier in the day and is a good way to increase the chance that the final promotion step will be successful.
Run the Notarize MacOSX Downloads CI job to notarize DMG packages on download.eclipse.org if the promoted build was unstable.
Send an email to epp-dev to request package maintainers test it. The email is templated in email.txt in the release directory.
Or use the Run toolbar button drop-down menu to launch the Send EMail launch configuration. This will automatically locate the email.txt to compose the email. Best to get the email drafted before the next step when using the launch configuration.
NOTE For R build the release is initially published to a temporary location and then moved to the R directory later. Make a note in the email where the temporary location is.
Update SIMREL_REPO to the staging repo so CI builds run against CI of SimRel, e.g., see this gerrit.
Or use the Run toolbar button drop-down menu to launch the Update to Staging Repository launch configuration. This will automatically determine the correct update site URL and will create an appropriate commit message in the system clipboard. At this point it's best to also update the MILESTONE in Updater.java so that staging builds produce results for the next milestone.
Archive old milestones/RCs so that they don't accumulate on the mirrors.
On all milestone/release days
This applies to all releases, i.e. M1, M2, M3, RC1 and R.
Everything except R is typically the Friday around 9:30am Ottawa time and the R is the following Wednesday sometime before 10am in coordination with the SimRel release engineer.
Optional - useful when testing changes to the promotion scripts: Run the build once in DRY_RUN mode to ensure that the output is correct before it applies changes to download.eclipse.org.
Send an updated email to epp-dev informing that the provisional URL has been renamed to R.
On Final release day
These jobs should be completed by approximately 10am Ottawa time on release days.
Run the Finalize Release CI job to create the "next" release and update the "latest" release as follows:
The EPP Release Process
This guide contains the step-by-step process to complete an EPP release and assumes that you have an IDE provisioned using the Oomph setup.
Before copying this file to create a new issue titled
EPP 2026-06 M1with labelendgame, update the names and versions, including those in this document.MILESTONE,PLATFORM_VERSION, and possiblyEXECUTION_ENVIRONMENTto the current appropriate values.Runtoolbar button drop-down menu to launch theUpdate Versionslaunch configuration to apply all the necessary name and version changes.Runtoolbar button drop-down menu to launch theOpen Issuelaunch configuration to apply all the necessary name and version changes, and to open a new properly-titled, properly-labeled issue; the body text is too long to automatically create the body of the issue, but that text is copied to the system clipboard, so you can use simply paste it into the body.The individual releases are tracked with endgame issues on GitHub.
For each release (M1, M2, M3, RC1, RC2) an endgame ticket is created with the appropriate contents from the rest of this document:
EPP releases happen for each milestone and release candidate according to the Eclipse Simultaneous Release Plan
Steps at the beginning of each release cycle, i.e., before M1:
This checklist is only used once per release cycle.
Scroll down for the per-milestone/RC steps.
Steps for all Milestones and RCs:
Check for bad links to issues (and other things) especially in
epp.website.xml.Make sure any outstanding reviews are progressing, e.g., create progress review, get PMC approval, etc.
Ensure that the CI build is green. Resolving non-green builds will require tracking down problems and incompatibilities across all Eclipse participating projects. The simrel-dev mailing list is a good place to start when tracking such problems.
Check that packages containing incubating projects have that information reflected in
Help -> Aboutdialog. See near the end of the build output for a report ofcheck-incubating.shscript.description,plugin.xml's productaboutTextandabout.propertiesblurb. In the past-incubationhad to appear in the file name and(includes Incubating components)had to appear inpackageMetaData. See Bug 564214 for documentation/votes on decision making.On RC1 check "new and noteworthy" version numbers. If any N&N are out of date, remove the N&N entries and notify the corresponding package maintainer.
url=(notice the blank before url) inepp.website.xmlto see which ones are contained in the different packages.Synchronize the following - Remember to check the branch; these links are to master, but around RC2 master may be set up for the next release already.
epp.productfiles.*.product/p2.inffiles.iconsroot directory.Update the Last Recorded +1 in the email template which lists any package and platform +1s that have been received since the last update.
Wait for announcement that the staging repo is ready on simrel-dev. An example announcement.
SIMREL_REPOinreleng/org.eclipse.epp.config/parent/pom.xmlif not done above.Runtoolbar button drop-down menu to launch theUpdate to Milestone Repositorylaunch configuration. This will automatically determine the correct update site URL and will create an appropriate commit message in the system clipboard.Update the build qualifiers to ensure that packages are all updated. See this gerrit for an example. Commit all other changes before this step because this step will automatically create a Git commit specifically for the forced qualifier changes. Use the
External Toolstoolbar drop-down menu to launch theUpdate Qualifierslaunch configuration. This runs the setGitDate bash script. This script will make a local commit you need to push; do not amend it because the timestamp is relevant.Run a CI build that includes the above changes.
Disable the CI build so that the build results are not overwritten while doing the promotion. You can disable the project once it has fully started running; you don't have to wait for the build to finish.
Check that there are no warnings in the console output. Especially look for warnings about failure to sign.
Run the Notarize MacOSX Downloads CI job to notarize DMG packages on download.eclipse.org. This can be done after promotion if time is tight or the notarization fails repeatedly. See Bug 571669 for an example of failures.
Check the build script output to make sure that the curl calls were successful, e.g., no
curl: (92) HTTP/2 stream 0 was not closed cleanly: INTERNAL_ERROR (err 2)messages. If there is an error like the above, the .dmg file that is copied to download.eclipse.org is corrupt. Run notarize-prepare-to-redo to rename the -signed file back to-tonotarizeand then re-run the notarize job job.Other notes about notarization
Sanity check the build for the following:
External Toolstoolbar button drop-down menu to launch thePrepare Staging Sanity Checklaunch configuration.This will automatically download the packages specified in the launch configuration to subfolders in
/org.eclipse.epp.packages/sanity-checkto make the follow steps easier.2026-06-M1.2026-06.Help -> Aboutsays the expected build name and milestone, e.g.,2026-06-M1.Console, open theHost OSGi consoleand usess -s INSTALLEDto verify that there are no bundles failing to resolve.org.eclipse.epp.package.*features and bundles have the timestamp of the forced qualifier update or later.Prepare Staging Sanity Checkautomatically configures the available updates sites for this test. To test the upgrade an equivalent to the simrel release composite site needs to be done. Add the following software sites to available software, check for updates and then make sure stuff works. In particular check error log and that core features, e.g., JDT, Platform, have been upgraded.https://download.eclipse.org/staging/2026-06/- NOTE UseSIMREL_REPOif the staging repo has been updated since theSIMREL_REPOlocation was created.https://download.eclipse.org/technology/epp/staging/repository/https://download.eclipse.org/justj/epp/milestone/latest-This is needed when there is a new version of JustJ that is not also published as a release. For example, Java 21 between 2024-06 M1 and release date of 2024-06.
Edit the Jenkins build.
2026-06 M1.Run the Promote a Build CI job to prepare build artifacts and copy them to download.eclipse.org.
DRY_RUNmode to ensure that the output is correct before it is copied to download.eclipse.org.DRY_RUNcan be done earlier in the day and is a good way to increase the chance that the final promotion step will be successful.Run the Notarize MacOSX Downloads CI job to notarize DMG packages on download.eclipse.org if the promoted build was unstable.
Send an email to epp-dev to request package maintainers test it. The email is templated in
email.txtin the release directory.Runtoolbar button drop-down menu to launch theSend EMaillaunch configuration. This will automatically locate theemail.txtto compose the email. Best to get the email drafted before the next step when using the launch configuration.Rbuild the release is initially published to a temporary location and then moved to theRdirectory later. Make a note in the email where the temporary location is.Update
SIMREL_REPOto the staging repo so CI builds run against CI of SimRel, e.g., see this gerrit.Runtoolbar button drop-down menu to launch theUpdate to Staging Repositorylaunch configuration. This will automatically determine the correct update site URL and will create an appropriate commit message in the system clipboard. At this point it's best to also update theMILESTONEinUpdater.javaso that staging builds produce results for the next milestone.Re-enable the CI build.
Archive old milestones/RCs so that they don't accumulate on the mirrors.
On all milestone/release days
This applies to all releases, i.e. M1, M2, M3, RC1 and R.
Everything except R is typically the Friday around 9:30am Ottawa time and the R is the following Wednesday sometime before 10am in coordination with the SimRel release engineer.
24-48 Hours Before Final release day
2026-06_R. Example command line:git tag --annotate 2026-06_R -m"2026-06 Release" 1b7a1c1af156e3ac57768b87be258cd22b49456b.DRY_RUNmode to ensure that the output is correct before it applies changes to download.eclipse.org.R.On Final release day
These jobs should be completed by approximately 10am Ottawa time on release days.
DRY_RUNmode to ensure that the output is correct before it applies changes to download.eclipse.org.