Skip to content

Project CRUD operations along with Unit testing and Example file for Project testing #40

Project CRUD operations along with Unit testing and Example file for Project testing

Project CRUD operations along with Unit testing and Example file for Project testing #40

Triggered via pull request September 11, 2025 12:03
Status Failure
Total duration 29s
Artifacts

lint.yml

on: pull_request
Matrix: lint
Fit to window
Zoom out
Zoom in

Annotations

7 errors
lint (3.13)
Process completed with exit code 2.
lint (3.12)
Process completed with exit code 2.
lint (3.12)
The strategy configuration was canceled because "lint._3_13" failed
lint (3.11)
The operation was canceled.
lint (3.11)
The strategy configuration was canceled because "lint._3_13" failed
lint (3.10)
The operation was canceled.
lint (3.10)
The strategy configuration was canceled because "lint._3_13" failed