Skip to content

Commit fe2b461

Browse files
committed
docs: propose live research team workspace and agent interaction design
Signed-off-by: huangruiteng <14976749+huangruiteng@users.noreply.github.com>
1 parent e7ef75c commit fe2b461

7 files changed

Lines changed: 729 additions & 2 deletions

‎docs/architecture/rfcs/README.md‎

Lines changed: 8 additions & 0 deletions
Original file line numberDiff line numberDiff line change
@@ -287,6 +287,14 @@ changes.
287287
Lark operation cards. Direct Goal workspace navigation and Overview compose
288288
bounded graph/acceptance readback, source navigation and snapshot export. General cross-channel disclosure,
289289
living documents and governed amendment/settlement review remain open.
290+
- [Live Team Workspace v0](live-team-workspace-v0.md)
291+
([中文版](live-team-workspace-v0.zh-CN.md))
292+
- **RFC status:** Draft presentation slice under intelligent presentation.
293+
- **Delivery on `main`:** Design proposal only; no live team-stream qualification.
294+
- **Current boundary:** A command surface plus spatial research studio, evidence
295+
handoff motion, conclusion revision and replay. L1 binds existing execution
296+
facts to packaged UI; L2 requires original-coordinator two-cycle acceptance;
297+
L3 qualifies semantic zoom and display scale. No new scheduler or authority.
290298
- [Human Attention Wishlist v0](human-attention-wishlist-v0.md)
291299
([中文版](human-attention-wishlist-v0.zh-CN.md))
292300
- **RFC status:** Draft, under maintainer review.

‎docs/architecture/rfcs/intelligent-review-presentation-surfaces-v0.md‎

Lines changed: 12 additions & 0 deletions
Original file line numberDiff line numberDiff line change
@@ -673,6 +673,18 @@ canonical facts, authority, evidence status, or whether an effect committed.
673673
Adaptive policies must be inspectable and resettable. Their outputs carry
674674
reason codes and preserve a deterministic fallback.
675675

676+
### 8.7 Live team workspace
677+
678+
[Live Team Workspace v0](live-team-workspace-v0.md) specifies the S5/R2 research
679+
journey: a command surface and spatial studio share typed facts with the list,
680+
semantic zoom and historical replay. Purposeful motion is a product objective;
681+
registration, execution, return, independent acceptance and requester adoption
682+
remain distinct. Preserve source/revision lineage and uncertainty; never infer
683+
activity from decorative motion or confidence from agreement counts. This is a
684+
Draft presentation slice, not a shipped team stream or new scheduling authority.
685+
Its L1–L3 plan and V1–V7 acceptance extend this RFC's Stage 3 presentation journey;
686+
they do not close cross-channel or governed settlement acceptance here.
687+
676688
## 9. Coverage across the long-horizon lifecycle
677689

678690
| Phase | Intelligent surface responsibility |

‎docs/architecture/rfcs/intelligent-review-presentation-surfaces-v0.zh-CN.md‎

Lines changed: 9 additions & 0 deletions
Original file line numberDiff line numberDiff line change
@@ -551,6 +551,15 @@ type PresentationArtifactPlan = {
551551

552552
Adaptive policy 必须 inspectable、resettable,其输出携带 reason codes,并始终保留 deterministic fallback。
553553

554+
### 8.7 团队实时工作区
555+
556+
[团队实时工作区 v0](live-team-workspace-v0.zh-CN.md) 描述 S5/R2 投研旅程:
557+
指挥台与空间工作室同列表、语义缩放和历史回放共用 typed 事实。有目的的动态
558+
是产品目标;注册、执行、返回、独立验收与请求方采用保持分离。保留来源 / 版本
559+
谱系和不确定性,不能由装饰动态推断活动或由共识人数推断置信度。这是 Draft
560+
展示切片,不是已交付的团队流,也不新增调度权限。其 L1–L3 计划与 V1–V7 验收
561+
展开本 RFC Stage 3 的展示旅程,不关闭本文跨渠道或受治理 settlement 验收。
562+
554563
## 9. 覆盖长程工作的完整生命周期
555564

556565
| 阶段 | 智能化界面的职责 |

‎docs/architecture/rfcs/live-team-workspace-v0.md‎

Lines changed: 374 additions & 0 deletions
Large diffs are not rendered by default.

‎docs/architecture/rfcs/live-team-workspace-v0.zh-CN.md‎

Lines changed: 302 additions & 0 deletions
Large diffs are not rendered by default.

‎docs/architecture/rfcs/loopx-overall-roadmap-v0.md‎

Lines changed: 14 additions & 1 deletion
Original file line numberDiff line numberDiff line change
@@ -39,7 +39,7 @@ P0 blocks correctness or continuity in the current user journey. P1 enables repe
3939
| **S2 Typed kernel and durable authority · P0/P1** | Effect/Todo/quota/recovery owners, TS migration and store candidates exist; writer cutover/provider promotion remain incomplete | Migrate one real transaction/recovery lifecycle at a time, with semantic counterexamples before cutover/deletion. R1 correctness precedes migration volume. Require real backend, concurrency/fence, ambiguous commit, retention/export recovery, bridge costs and D1–D3 evidence |
4040
| **S3 Goal planning and multi-Agent collaboration · P0/P1** | Vision/replan, peer frontiers, claim/lease, directory, manager_context and explicit continuation exist; general handoff/shared amendment remain incomplete | R2 proves peer dependency; R3 closes parallel joins, pipelines, help/review, continuation and automatic return; R4 delivers one intent-preserving amendment class. Cover cycles, invalidated inputs, rejection/deferral, lease transfer, competing bases and aggregate acceptance |
4141
| **S4 Runtime/host/daemon · P0/P1** | Attached/managed, Turn, broker, runtime connectors and Desktop repairs exist; registration does not establish executable capacity | Qualify multi-Turn supervision for one real supported combination; restart/cancel/drain/stop retain work and fence old executors. Then expand host parity, unique service-profile ownership, clean installation and upgrades; show unsupported adapter capabilities |
42-
| **S5 Frontend, Lark and human interaction · P0/P1** | Local chat, settings, proposals and partial Goal Channel verticals exist; shared audience/session/work readback needs qualification | One journey spans settings, work graph, handoff, blockers, cost, corrections, artifacts and return. Shared typed projections; reconnect/repeated-click/stale/original-route cases. Then intelligent review, keyboard accessibility, bilingual terminology, actionable errors and offline degradation; interrupt only for actual decisions |
42+
| **S5 Frontend, Lark and human interaction · P0/P1** | Local chat, settings, proposals and partial Goal Channel verticals exist; shared audience/session/work readback needs qualification | One journey spans settings, work graph, handoff, blockers, cost, corrections, artifacts and return. Shared typed projections; reconnect/repeated-click/stale/original-route cases. [Live team workspace](live-team-workspace-v0.md) makes exchange, revision and original-coordinator continuation visible. Then intelligent review, keyboard accessibility, bilingual terminology, actionable errors and offline degradation; interrupt only for actual decisions |
4343
| **S6 Materials, evidence, memory and learning · P1** | Authority registry, material lifecycle/frontier, decision context, reward memory and turn recall exist; direction baseline and parts of attribution remain proposed | Connect material revision→same-Agent read→decision reference→artifact/outcome. Expose expiry/revocation/source loss and forgetting policy. Handoff preserves decision-relevant summaries and authorized artifacts; qualify OpenViking/Obelisk as optional providers. Prove causal utility with controls, not relevance alone |
4444
| **S7 Budget, scheduling and fleet scale · P0 observation/P1–P2 expansion** | Quota/scheduler and partial usage aggregates exist; full provider cost, distributed reservations and hundred-Agent concurrency need evidence | Separate configured budget, admission, consumption and estimates; unknown is not zero and replay cannot double-charge. R7 pagination/bounded summaries, provider/host limits, fairness, backpressure, event wake and isolation; report registration/activity/throughput and cost per accepted outcome separately |
4545
| **S8 Capabilities, extensions and domain integration · P1/P2** | Capability catalog, extension lifecycle, hooks, engineering/research/content/office capabilities and computer-use contracts exist | First exercise the shared control plane with existing issue-fix/PR-review and material/research callers. Every provider has readiness/version/permissions/default-off/uninstall/rollback/isolation and real-entry evidence. New domain effects start with one simulated operation, not a marketplace or workflow DSL |
@@ -295,6 +295,19 @@ This qualifies a local execution-facts readback, not the full R2 ladder: assignm
295295
receipt integration, provisioning, remote probes, two-cycle continuation and Lark
296296
qualification remain open under their existing owners.
297297

298+
**Live team experience is a core S5 outcome.** The [Live Team Workspace
299+
RFC](live-team-workspace-v0.md) joins a precise command surface with a spatial
300+
research studio: visible artifact exchange, sourced disagreement, conclusion
301+
revision, replay and semantic zoom. It is a presentation slice of existing
302+
owners, not a second orchestrator. The next complete frontend slice connects
303+
requester-scoped execution/return facts to one recoverable projection and the
304+
packaged workspace, with independent CLI readback and honest degraded states.
305+
Then qualify the original research coordinator through the same two real cycles
306+
required above. Existing runtime admission/provider repairs retain their owner;
307+
a synthetic scene is not readiness evidence. Expand display load 10→30→100 only
308+
under frozen rendering/attention budgets, separately from live R7 concurrency.
309+
Current status is design proposal; no G1 or default-screen promotion.
310+
298311
### R3: Semantic Requests and Automatic Return
299312

300313
- **Owner:** manager RFC M2/M3; migrate existing `manager_context` request/tracking/return into one typed collaboration transaction, incorporating the #4094 adapter.

‎docs/architecture/rfcs/loopx-overall-roadmap-v0.zh-CN.md‎

Lines changed: 10 additions & 1 deletion
Original file line numberDiff line numberDiff line change
@@ -39,7 +39,7 @@ LoopX 的目标是让人用本地前端或 Lark 提出、修订和验收复杂
3939
| **S2 typed 内核与 durable authority · P0/P1** | Effect/Todo/quota/recovery owner、TS 事务迁移与 store 候选已存在;writer 和 provider 晋升仍未全闭合 | 每次迁移一个真实事务/恢复生命周期,先语义反例再切换/删除旧 owner;R1 正确性先于迁移数量。真实 backend、并发/fence、ambiguous commit、保留/导出恢复、bridge 成本及 D1–D3 资格 |
4040
| **S3 目标规划与 multi-Agent 协作 · P0/P1** | Vision/replan、peer frontier、claim/lease、directory、manager_context 和显式接续有基础;通用 handoff/共享修订未闭环 | R2 必须证明 peer 依赖;R3 完成并行汇合、流水线、求助/复核、接续、自动回报;R4 做一个保持 intent 的 amendment class。检查依赖环、输入失效、拒绝/延期、lease 转移、同基线竞争及 aggregate acceptance |
4141
| **S4 runtime/host/daemon · P0/P1** | attached/managed、Turn、broker、runtime connector 和 Desktop 修复存在;“registered”不等于可执行 | 选择一个真实合格组合完成多 Turn supervision;restart/cancel/drain/stop 不丢工作且旧 executor 被 fence。之后扩 host parity、service-profile 唯一 owner、干净安装与版本升级;按 adapter 能力显示不支持项 |
42-
| **S5 前端、Lark 与人机交互 · P0/P1** | 本地对话、settings、proposal 和部分 Goal Channel vertical 已有;统一受众/会话/工作回读仍需资格 | 用一个团队旅程贯穿设置、工作图、handoff、阻塞、成本、修订、产物和回报;共享 typed projection,验证重连/重复点击/stale/原路反馈。再做 intelligent review、无障碍键盘流程、中英术语、错误可恢复和离线降级;只在真实决策处打断人 |
42+
| **S5 前端、Lark 与人机交互 · P0/P1** | 本地对话、settings、proposal 和部分 Goal Channel vertical 已有;统一受众/会话/工作回读仍需资格 | 用一个团队旅程贯穿设置、工作图、handoff、阻塞、成本、修订、产物和回报;共享 typed projection,验证重连/重复点击/stale/原路反馈。再做 intelligent review、无障碍键盘流程、中英术语、错误可恢复和离线降级;只在真实决策处打断人;[团队实时工作区](live-team-workspace-v0.zh-CN.md)让交换、修订与原协调员继续推进可见 |
4343
| **S6 材料、证据、记忆与学习 · P1** | authority registry、material lifecycle/frontier、decision context、reward memory、turn recall 已有;方向基线和部分归因仍是提案 | 先打通“材料 revision→同 Agent 阅读→决策引用→产物/结果”;失效、撤销、来源消失与遗忘策略可回读。handoff 保存影响决策的摘要与授权 artifact;OpenViking/Obelisk 按可选 provider 资格化。utility 的因果收益另以对照证明,不把相关性当提升 |
4444
| **S7 预算、调度与 fleet 规模 · P0 观测/P1–P2 扩展** | quota/scheduler 与部分 usage aggregate 存在;全 provider 成本、分布式资源预留及百 Agent 并发尚需证据 | 先区分配置预算、准入、消耗与估算;未知成本不记零、重复事件不双记。R7 分页/有界摘要、provider/host 限流、公平性、背压、事件唤醒与失败隔离;分别报告注册数/活跃数/吞吐量和每个验收成果成本 |
4545
| **S8 能力、扩展与领域集成 · P1/P2** | 已有 capability catalog、extension 生命周期、hook、工程/研究/content/office 能力及 computer-use 合同 | 优先用现有 issue-fix/PR-review 和材料/研究 caller 检验共享控制面;每个 provider 带 readiness、版本、权限、默认关闭、卸载/回滚、失败隔离与真实入口证据。新 domain effect 从模拟单操作闭环开始,不先建市场或通用工作流 DSL |
@@ -272,6 +272,15 @@ executor/profile 检查启动条件。任务准入、当前 pinned 验收绑定
272272
检查,不新增状态账本,也不启动执行。这只验收本地执行事实的读回;计划分配回执
273273
整合、通用创建、远端探针、两轮持续协作及 Lark 等价仍由原 owner 继续推进。
274274

275+
**团队现场是 S5 核心产品目标。** [团队实时工作区 RFC](live-team-workspace-v0.zh-CN.md)
276+
融合精确指挥台与空间研究工作室:展示产物交换、有来源的分歧、结论修订、回放与
277+
语义缩放。它复用既有 owner,不建立第二套编排。下一完整前端切片将 requester
278+
范围的执行 / 返回事实接入可恢复投影与打包工作区,提供独立 CLI 回读和真实降级
279+
状态;随后按上述标准验收原投研 coordinator 的两轮真实协作。既有 runtime
280+
准入 / provider 修复保留原 owner;合成场景不能充当 readiness 证据。展示负载
281+
10→30→100 在测前冻结渲染 / 注意力预算,和 R7 实际并发分开资格化。当前为设计
282+
提案,不晋升 G1 或默认首屏。
283+
275284
### R3:语义请求与自动回报
276285

277286
- **Owner:** 管家 RFC M2/M3;从已有 `manager_context` request/tracking/return 迁移到单一 typed collaboration 事务,纳入 #4094 adapter。

0 commit comments

Comments
 (0)