So that scheduling takes into account transportation time. Say:
- Event 1 is on location A
- Event 2 is on location B
- Event 1 and Event 2 are 1 hour apart
- Location A and location B are a 45 minute drive apart
In this scenario, scheduling a 30 minute event between E1 and E2 should fail, as you only have 15 minutes available. Worse if the new event is also on another location.
So that scheduling takes into account transportation time. Say:
In this scenario, scheduling a 30 minute event between E1 and E2 should fail, as you only have 15 minutes available. Worse if the new event is also on another location.