Skip to content

vendor: add lock-pinned flow-vendor workflow #65

vendor: add lock-pinned flow-vendor workflow

vendor: add lock-pinned flow-vendor workflow #65

Triggered via push February 21, 2026 13:36
Status Failure
Total duration 33s
Artifacts –

canary.yml

on: push
Matrix: build
build-linux-host-simd
30s
build-linux-host-simd
release
0s
release
Fit to window
Zoom out
Zoom in

Annotations

8 errors
build (aarch64-apple-darwin, macos-latest)
Process completed with exit code 101.
build (aarch64-unknown-linux-gnu, ubuntu-latest)
The strategy configuration was canceled because "build.aarch64-apple-darwin_maco" failed
build (aarch64-unknown-linux-gnu, ubuntu-latest)
The operation was canceled.
build (x86_64-unknown-linux-gnu, ubuntu-latest)
The strategy configuration was canceled because "build.aarch64-apple-darwin_maco" failed
build (x86_64-unknown-linux-gnu, ubuntu-latest)
Process completed with exit code 101.
build (x86_64-apple-darwin, macos-latest)
The strategy configuration was canceled because "build.aarch64-apple-darwin_maco" failed
build (x86_64-apple-darwin, macos-latest)
Process completed with exit code 101.
build-linux-host-simd
Process completed with exit code 101.