Skip to content

Bump step-security/harden-runner from 2.13.3 to 2.14.0 #116

Bump step-security/harden-runner from 2.13.3 to 2.14.0

Bump step-security/harden-runner from 2.13.3 to 2.14.0 #116

Status Failure
Total duration 42s
Artifacts

build.yml

on: push
ruby-versions  /  Generate Ruby versions
5s
ruby-versions / Generate Ruby versions
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

9 errors
build (2.5 / ubuntu-latest)
The process '/opt/hostedtoolcache/Ruby/2.5.9/x64/bin/bundle' failed with exit code 1
build (2.6 / ubuntu-latest)
The strategy configuration was canceled because "test._2_5_ubuntu-latest" failed
build (2.6 / ubuntu-latest)
The operation was canceled.
build (2.7 / ubuntu-latest)
The strategy configuration was canceled because "test._2_5_ubuntu-latest" failed
build (2.7 / ubuntu-latest)
The operation was canceled.
build (2.7 / macos-latest)
The strategy configuration was canceled because "test._2_5_ubuntu-latest" failed
build (2.7 / macos-latest)
The operation was canceled.
build (2.6 / macos-latest)
The strategy configuration was canceled because "test._2_5_ubuntu-latest" failed
build (2.6 / macos-latest)
The operation was canceled.