Skip to content

feat(contract): utilization-curve (jump-rate) interest model #2

@thefifthdev

Description

@thefifthdev

Problem

Interest is a flat APR; rates should respond to utilization.

Acceptance criteria

  • Base + slope below kink, steep slope above
  • Tests across utilization levels

Metadata

Metadata

Assignees

No one assigned

    Labels

    Stellar WaveEligible for Stellar Wave / Drips contributor rewardsarea: contractSoroban contract

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions