Skip to content

feat: update log time #13

feat: update log time

feat: update log time #13

Triggered via push January 14, 2026 09:53
Status Failure
Total duration 35s
Artifacts –

ci.yml

on: push
Lint Code
9s
Lint Code
Build Docker Image
33s
Build Docker Image
Matrix: Run Tests
Fit to window
Zoom out
Zoom in

Annotations

6 errors
Lint Code
Process completed with exit code 1.
Run Tests (3.10)
Process completed with exit code 1.
Run Tests (3.9)
The strategy configuration was canceled because "test._3_10" failed
Run Tests (3.9)
Process completed with exit code 1.
Run Tests (3.11)
The strategy configuration was canceled because "test._3_10" failed
Run Tests (3.11)
The operation was canceled.