Skip to content

Antalya 26.8 - CI/CD reliability fixes - #2405

Merged
strtgbb merged 8 commits into
antalya-26.8from
rebase-cicd-v26.8.7.19-lts
Oct 2, 2026
Merged

strtgbb merged 8 commits into
antalya-26.8from
rebase-cicd-v26.8.7.19-lts

round vector-search L2Distance and lengthen swarm shutdown drain

287493f
Select commit
Loading
Failed to load commit list.
DCO-2 / DCO succeeded Oct 2, 2026 in 1s

Check passed!

All commits are signed off, the check passed.

Summary


Sha Message Pass or fail reason
🟢 b778e67 fix PRs table being broken by a PR 404 Skipped: sign-off not required for members
🟢 2f53ed2 Recognize Altinity CI report comments in `fetch_ci... Skipped: sign-off not required for members
🟢 258c09f increase retries for stress tests server startup Skipped: sign-off not required for members
🟢 b63d9a2 try to resolve build failures due to submodule cac... Skipped: sign-off not required for members
🟢 4b69eb0 increase timeouts for integration and stress Skipped: sign-off not required for members
🟢 f0e5578 increase timeout in install_thread_pool_fault_inje... Skipped: sign-off not required for members
🟢 a4d442f Use Antalya version flavour on antalya-26.8 Skipped: sign-off not required for members
🟢 287493f round vector-search L2Distance and lengthen swarm ... Skipped: sign-off not required for members