Skip to content

chore: prepare v0.21.1 release - #313

Merged
Devin-AXIS merged 1 commit into
mainfrom
agent/prepare-v0.21.1
Aug 14, 2026
Merged

chore: prepare v0.21.1 release#313
Devin-AXIS merged 1 commit into
mainfrom
agent/prepare-v0.21.1

Conversation

@Devin-AXIS

Copy link
Copy Markdown
Owner

What changed

  • Align ipollowork-server and ipollowork-orchestrator with the existing 0.21.1 desktop version.
  • Remove a stale Design test for a withdrawn bundled template.
  • Update Video Studio test assertions to match the current canvas warning and multi-source rebuild behavior.
  • Restore template-market tests to the current curated customer catalog.

Why

The formal release gate requires all package versions to match. Current main also contained stale post-merge test assertions that failed against the already-shipped Design, Video Studio, and curated template behavior.

Impact

No user-facing Design, Video, template, plugin, or Skill behavior changes. This commit only aligns release metadata and test coverage with current behavior.

Verification

  • App unit tests: 743 passed
  • Server tests: 446 passed, 3 skipped
  • App typecheck: passed
  • Orchestrator typecheck: passed
  • Release review and v0.21.1 tag verification: passed
  • Maintainability audit and git diff check: passed

@Devin-AXIS
Devin-AXIS marked this pull request as ready for review August 14, 2026 08:53
@Devin-AXIS
Devin-AXIS merged commit a597401 into main Aug 14, 2026
1 of 3 checks passed
@Devin-AXIS
Devin-AXIS deleted the agent/prepare-v0.21.1 branch August 14, 2026 08:57
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants