Objective
Measure, don't assume — document whether Worker simulation is actually worth it for this workload.
Measure
- Main-thread frame p95
- Simulation p95
- Worker message latency
- Snapshot serialization cost
- Message count/sec
Note: for a small Snake simulation, Worker can cost more than it saves — that is an acceptable and technically valuable conclusion. The goal is learning and evidence, not automatically claiming Worker is faster.
Exit criteria (closes Phase 5 / M5)
Objective
Measure, don't assume — document whether Worker simulation is actually worth it for this workload.
Measure
Note: for a small Snake simulation, Worker can cost more than it saves — that is an acceptable and technically valuable conclusion. The goal is learning and evidence, not automatically claiming Worker is faster.
Exit criteria (closes Phase 5 / M5)
v2.1.0