Skip to content
This repository was archived by the owner on Jul 31, 2025. It is now read-only.

Summer timeline

Leili edited this page Jul 18, 2017 · 7 revisions

Below is a rather aggressive timeline. Built into later weeks is time to catch-up on outstanding writing tasks. The most pressing need is to build out instruments for data collection (survey and questionnaire for use cases).

July 6

July 11

July 18

July 25

  • Draft Background
  • Outline Methods
  • Survey sent to participants

Aug 1

  • Catch up
  • Scan for potential in-depth cases
  • Check-in on progress of survey responses (most responses come within 48 hours)

Aug 8

  • Cases selected
  • Methods drafted

Aug 15

  • Catch up on drafting
  • Follow up email to participants about survey
  • Any documentation or info to andover project, and agreement for how to move forward

End of quarter

If we both want to continue - some direction on how to do so...

  • Interviews for Case Studies
  • Case Study writing
  • Analyses of survey results

Paper sections that will need to be written:

  • Results from survey
  • Case study overview
  • Case study narratives
  • Discussion section (bringing together results from survey and cases)
  • Conclusions and Future work

Clone this wiki locally