Skip to content

Test Bunny ready transition dispatch#49

Open
Promansis wants to merge 1 commit into
refactorfrom
test/bunny-ready-transition
Open

Test Bunny ready transition dispatch#49
Promansis wants to merge 1 commit into
refactorfrom
test/bunny-ready-transition

Conversation

@Promansis

Copy link
Copy Markdown
Owner

Fixture PR to test Bunny Review draft-to-ready behavior against refactor.\n\nExpected coverage:\n- Opens as draft so Bunny can review the head SHA while draft.\n- Marking this PR ready should dispatch Bunny again even if that same SHA was already reviewed.\n- ready_for_review should request full mode and recompute ready-policy status.\n\nLeave it draft until the draft Bunny review appears, then mark ready to verify the transition event.

@github-actions

github-actions Bot commented Jun 6, 2026

Copy link
Copy Markdown

✅ Bunny Review Completed

Tip

Review posted. The specimen has left the observation table.

  • Commit: 6193595 - Add Bunny ready transition fixture

@github-actions

github-actions Bot commented Jun 6, 2026

Copy link
Copy Markdown

🐰 Bunny Review

Bunny Merge Signal: Ready With Notes

Warning

READY WITH NOTES
No actionable defects were isolated, but non-blocking notes remain.

Findings Nitpicks Controls Reviewed Head Mode
0 0 1 unknown, 1 pass 6193595a full

Note

Mode: full
Head: 6193595 - Add Bunny ready transition fixture
Base: origin/refactor - Merge remote-tracking branch 'origin/refactor' into bunny-ci-review-hardening

🧭 Specimen Summary

  • The specimen adds a small GitHub-side fixture for the draft-to-ready Bunny Review transition, a tidy little inscription meant to pin one CI dispatch ritual in place. No product organ, engine nerve, storage vessel, mode boundary, or runtime artery is touched; the experiment is administrative parchment, not executable anatomy. Static inspection finds no mechanism here capable of breaking behavior, only a fixture whose claims await the surrounding automation to prove them.

🔎 Isolated Defects

Tip

No actionable defects isolated.

🧹 Nitpicks

  • None recorded.

✅ Control Checks

Status Type Check Detail
✅ PASS CI Timing CI Status Expected CI controls completed without a reported failure.
⚠️ UNKNOWN Proof Gap Docs validation A Markdown fixture changed under .github; no pnpm check:docs result is present, though the file is too inert to expose a concrete failure path.

🧪 Observations

  • Inspected the full diff from merge base 332fbef to head 6193595.
  • Reviewed the sole changed file, .github/bunny-review-test/ready-transition.md, and found no executable CI behavior hidden in the change.
  • Applied AGENTS.md ownership rules; the change remains inside .github fixture territory and does not disturb product, engine, runtime, or mode boundaries.

🧰 CI Status

  • pass: Frontend, Architecture, and Organization
  • pass: Rust Capability Layer
  • pass: Browser Smoke and Performance
  • note: Bunny gates only required job conclusions from ci-checks.json; advisory reports such as continue-on-error dependency checks are not included in this status.

@Promansis Promansis marked this pull request as ready for review June 6, 2026 04:27
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant