Skip to content

Milestones

List view

  • Road to Parity pillar P8 (epic #257). OpenSCENARIO model, Map/Scenario mode, routes, storyboard editor, esmini preview, GW-6 authoring. Closes when all sprints are merged and the GW-6 hand-run passes.

    No due date
    7/9 issues closed
  • Road to Parity pillar P7 (epic #256). Export preview tools, GIS import (bounded CRS family + libtiff, no GDAL/PROJ — ADR-0010), lidar import (in-house ASPRS LAS/LAZ + laz-perf, no PDAL — ADR-0011), OSM extraction. Closes when all sprints are merged and the GW-2 preview steps pass.

    No due date
    6/19 issues closed
  • Road to Parity pillar P6 (epic #255). Project model, Library Browser, prop tools + Prop Sets, PBR-lite materials, CC0 starter library, instanced rendering. Closes when all sprints are merged and the GW-2/GW-3/GW-5 hand-runs pass.

    No due date
    26/43 issues closed
  • Road to Parity pillar P5 (epic #254). Surface node-graph tool, elevation-terrain coupling, Road Construction tool with bridge spans, heightmap terrain. Closes when all sprints are merged and the GW-2 hand-run passes.

    No due date
    5/9 issues closed
  • Road to Parity pillar P4 (epic #253). Corner tool, junction materials, maneuver roads, Signal tool, Signal Phase Editor, Sign tool. Closes when all sprints are merged and the GW-3/GW-4 hand-runs pass.

    No due date
    15/18 issues closed
  • Road to Parity pillar P3 (epic #252). Crosswalks, stop lines, marking tools, stencils, per-instance marking materials. Closes when all sprints are merged and the GW-2/GW-5 hand-runs pass.

    No due date
    5/6 issues closed
  • Road to Parity pillar P2 (epic #251). Road-plan authoring parity, lane tool suite, ground surfaces, road styles, in-app Help seed. Closes when all sprints are merged and the GW-2 hand-run passes.

    No due date
    35/45 issues closed
  • Road to Parity pillar P1 (epic #250). Orbit-pivot camera, Attributes pane, 2D Editor pane host, shortcut map. Closes when all sprints are merged and the GW-1 hand-run passes.

    No due date
    17/20 issues closed