feat(contracts): freeze frontend boundary with B05 fields, mock server, and P4 manifest - #34

Merged
kapustazh merged 1 commit into
developfrom
milestone/gate-p4-frontend-freeze
Sep 8, 2026
Merged

kapustazh merged 1 commit into
developfrom
milestone/gate-p4-frontend-freeze

Conversation

@kapustazh

@kapustazh kapustazh commented Sep 8, 2026 •

Copy link
Copy Markdown
Collaborator

Summary

Freezes the Gate P4 frontend boundary to unblock Milestone B05:

  • Adds additive sanitized fields needed by B05 to OpenAPI v1 (policy summary on IntentResponse, authorization_status on AttemptView, and token_contract + explorer_url on SettlementView).
  • Regenerates @oneshot/contracts artifacts without drift (contracts.schema.json, openapi.v1.json, api-types.ts).
  • Publishes 7 sanitized UI fixtures under packages/contracts/fixtures/ui/v1/ and validates them against the JSON Schema bundle via validate-fixtures.mjs.
  • Implements and exports a versioned OpenAPI mock server (OPENAPI_MOCK_SERVER_VERSION = '1.0.0') in @oneshot/contracts covering all 6 frozen routes with fail-closed /retry rejection.
  • Publishes docs/GATE_P4_MANIFEST.md and marks Step 4 as [COMPLETED] in docs/GATE_P4_CHECKLIST.md.

Scope and acceptance criteria

  • The change is limited to the stated milestone or issue.
  • Acceptance criteria are listed and satisfied.
  • No unrelated cleanup is included.

Product and security invariants

  • Tenant isolation remains fail-closed.
  • Sponsor authorization, auditability, and daily caps remain enforced where applicable.
  • Recipients cannot modify sponsor controls or access sponsor-only data.
  • No secret, token, production identifier, or personal data is committed or pasted into review prompts.
  • Any non-applicable invariant is explained below.

Invariant notes:

Contract additions are strictly optional and additive; no existing backend or worker behavior is changed. The mock server strictly forbids blind payment retries (rejects /retry paths). No secrets are stored or transmitted.

Validation

Commands and results:

pnpm check:generated: PASS (0 drift)
pnpm validate:fixtures: PASS (9 contracts-v1 + 7 ui-v1 fixtures validated)
pnpm format:check: PASS
pnpm lint: PASS
pnpm typecheck: PASS
pnpm test: PASS (44 test files, 585 tests)
npx markdownlint-cli2 "**/*.md" "#node_modules": PASS (96 files, 0 issues)

Independent review evidence

Gate A — exact candidate tree before push

  • Base commit SHA: 4afd70916a84946aa3230cd29ccd3b68a2b2da58

  • Candidate tree SHA: 408976302803470862aacf47338e002bf6ffa797

  • Candidate commit SHA (if already committed but unpushed): 0ce3a8974f3ba926bfba5ff15dcd7c85f4f81fa1

  • Reviewer tool: free-pi-cli

  • Reviewer model: glm-5.3-flash

  • Verdict: VERDICT: PASS

  • Findings or residual risks: Non-blocking note on mock reconcile gating for non-terminal states; no invariant, security, or idempotency violation.

  • The reviewed tree equals the committed tree.

Gate B — exact remote PR head

  • Pull request URL/number: #34

  • Remote head commit SHA: 0ce3a8974f3ba926bfba5ff15dcd7c85f4f81fa1

  • Remote head tree SHA: 408976302803470862aacf47338e002bf6ffa797

  • Reviewer tool: free-pi-cli

  • Reviewer model: glm-5.3-flash

  • Verdict: VERDICT: PASS

  • Findings or residual risks: Non-blocking notes on mock-server synthesis semantics for non-seeded intents, allowed_recipients lack of maxItems, and context file pending gate tags. All invariants and acceptance criteria verified.

  • Gate B reviewed the current remote head and matches Gate A's approved tree, or a fresh Gate A was run for the changed tree.

  • Agent policy / repository-policy and all applicable CI checks pass.

CI check evidence:

Risk and rollback

  • Residual risks: Low. All schema additions are optional. UI fixtures and mock server are additive development aids for B05.
  • Rollback or recovery plan: Revert commit 0ce3a8974f3ba926bfba5ff15dcd7c85f4f81fa1.

Human merge

  • A human owner has reviewed the evidence and will perform the merge.

@kapustazh
kapustazh marked this pull request as ready for review September 8, 2026 14:19
@kapustazh
kapustazh merged commit 8f3249a into develop Sep 8, 2026
4 checks passed
@SuPuHe
SuPuHe deleted the milestone/gate-p4-frontend-freeze branch September 8, 2026 22:09
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant