Summary

Expand the product delivery plan into a backend-first, three-coder roadmap designed for asynchronous execution. This adds a proposed frozen v1 contract pack, lane indexes, and 18 independently closable work packets (six per coder, 90 commit-sized subtasks total). Frontend packets remain held until project Gate P4.

Scope and acceptance criteria

  • The change is limited to the stated milestone or issue.
  • Acceptance criteria are listed and satisfied.
  • No unrelated cleanup is included.

Acceptance criteria:

  • Detailed master plan for three coders with explicit ownership and convergence gates.
  • 18 independently closable packets, each with exactly five small tasks, acceptance evidence, handoff artifact, no-wait continuation, and non-goals.
  • Backend packets depend only on the frozen contract pack and the same coder's previous packet.
  • A05/B05/C05 remain blocked until project Gate P4 freezes the integrated backend seams.

Product and security invariants

  • Tenant isolation remains fail-closed.
  • Sponsor authorization, auditability, and daily caps remain enforced where applicable.
  • Recipients cannot modify sponsor controls or access sponsor-only data.
  • No secret, token, production identifier, or personal data is committed or pasted into review prompts.
  • Any non-applicable invariant is explained below.

Invariant notes:

This is a planning-only change. It preserves and strengthens the documented one-intent/at-most-one-settlement rule, UNKNOWN reconciliation without blind retry, integer-string money representation, Graph non-authority, testnet-first operation, redaction, and human-only external configuration. No product code, runtime configuration, or dependency is changed.

Validation

Commands and results:

repository-policy checks: PASS
structural plan validator: PASS (18 packets; 90 subtasks; required packet sections present)
planning-set measurement: PASS (2,004 lines; 13,285 words)
git diff --check origin/develop...HEAD: PASS
conflict-marker scan: PASS
tracked-diff secret-shape scan: PASS
local Markdown link resolution: PASS
working tree cleanliness: PASS

Independent review evidence

Gate A — exact candidate tree before push

  • Base commit SHA: 971e5108cb276eef9735ff4265e12972aa5c2240

  • Candidate tree SHA: 47428c2932f426339e2ef8cf08aa5c4ce9556815

  • Candidate commit SHA (if already committed but unpushed): a2a65fc6aad0a2b21065713fbaa7e5f0edd98c26

  • Reviewer tool: free-pi-cli

  • Reviewer model: deepseek-v4-flash (FreePi UI; verdict field reported not exposed by platform)

  • Verdict: VERDICT: PASS

  • Findings or residual risks: no blocking findings. Non-blocking notes: the historical context record reflects its pre-commit state; project execution still requires human P0 approval; live-testnet evidence remains dependent on human provisioning.

  • The reviewed tree equals the committed tree.

Gate B — exact remote PR head

  • Pull request URL/number: pending draft creation

  • Remote head commit SHA: a2a65fc6aad0a2b21065713fbaa7e5f0edd98c26

  • Remote head tree SHA: 47428c2932f426339e2ef8cf08aa5c4ce9556815

  • Reviewer tool: free-pi-cli

  • Reviewer model: pending required CI

  • Verdict: pending required CI

  • Findings or residual risks: pending

  • Gate B reviewed the current remote head and matches Gate A's approved tree, or a fresh Gate A was run for the changed tree.

  • Agent policy / repository-policy and all applicable CI checks pass.

Risk and rollback

  • Residual risks: this is an unexecuted plan; P0 contract-pack approval and later live-testnet evidence are intentionally human-gated. The committed session context records its pre-commit state but does not affect plan correctness.
  • Rollback or recovery plan: close the draft PR or revert the planning commit; no runtime state, deployment, data, or dependency requires rollback.

Human merge

  • A human owner has reviewed the evidence and will perform the merge.

@SuPuHe
SuPuHe marked this pull request as ready for review September 6, 2026 18:51
@SuPuHe
SuPuHe merged commit 5ef6a66 into develop Sep 6, 2026
1 check passed
@SuPuHe
SuPuHe deleted the milestone/expand-product-plan branch September 7, 2026 21:15
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant