Phase 00 Delivery: Planning Freeze, Scaffold, and 002B1 Contract - #46
Merged
Merged
Conversation
- Freeze VID-SPEC-001 through VID-SPEC-015 with acceptance evidence - Accept VID-DEC-001, VID-DEC-002, VID-DEC-003, VID-DEC-004 with hashes - Record Phase 00 entry gate audit (all 15 P0 artifacts) - Add conformance fixtures and budgets for v0.1.0-alpha - Add GitHub configuration: issue templates, release policy, CI guards Accepted evidence: - VID-DEC-003@1.0 reviewed hash: E4B7D0A717E9A4DE2D3675A038D5BE739CCF2CFA3D0A179A4821ABA3EE78AD1D - VID-DEC-003@1.0 accepted hash: 0C6A9056083BFC741B49DE908F74597D9BD8546B69EB75AE8C342B6EA06E2851 Closes #19
Repository and toolchain: - Add VideoLocalization.sln and core project structure - Pin toolchain: C#/.NET 10, WinUI 3, Rust, Protobuf - Configure NuGet, build properties, engineering workflow - Add build validation CI scaffold template VID-IMPL-P00-001 scaffold evidence (41/41 build, 24/24 tests): - Toolchain verification and version pinning - Build report from scaffold validation - Test report from fixture loader VID-IMPL-P00-002A preflight acceptance (9/9 tests): - Hostile local-path preflight and SHA-256 fingerprint - Acceptance evidence from independent post-correction review Closes #30, #31
VID-IMPL-P00-002B1 Contract Bundle: - Canonical versioned schemas (7 schema files with stable IDs) - OperationDescriptor and WorkerHello fixtures - Complete 9 VID-INGEST-* to Shared state mapping - probe_observation artifact/publication fixture - Input manifest and lease identity binding Fail-Closed Adapter Boundary: - Rust worker scaffold with contract validation - Protocol IPC over Protobuf (video_core.proto) - Pre-launch validation for executable identity, lease, argv, limits - Immutable input staging and output bounding - Evidence: 7 focused tests, 16 total tests pass Product scaffolding: - C# projects: App, Core, Shared (framework only, no logic) - Rust worker build configuration and dependencies - No real ffprobe execution or verification yet Limitations (as per acceptance): - No actual ffprobe child execution - No OS network-denial verification - No live Job Object/watchdog evidence - No synthetic Matroska observation - No playback/import/export/delivery claims - No redistribution or real-probe verification (002B2 scope) Tests: 7/7 focused contract checks, 16/16 total pass
Remove workers/VideoLocalization.Worker/target/ from Git index (preserves local files) and add **/target/ to .gitignore to prevent future tracking of Rust build artifacts. This corrects commit c0f91ca which accidentally tracked 1,533 generated files that should have been excluded. Co-Authored-By: Claude Haiku 4.5 <noreply@anthropic.com>
…resource and control profiles - Add record-digest-profile.md documenting exact-byte serialization rules - Add resource-profile.json with accepted VID-PROBE-P00-001 limits and capabilities - Add control-protocol.json binding SUI-SPEC-003 revision 1.0 and 002B1 contract constraints - Add records/manifest.json with complete authority closure and hash bindings - Record freeze accepted under OWNER-AUTH-V2; no scope expansion or alterations Co-Authored-By: Claude Haiku 4.5 <noreply@anthropic.com>
Member
Author
VID-IMPL-P00-002B2 Delivery Complete (Phase 00 C4 Acceptance)Status: ✅ Accepted under OWNER-AUTH-V2 Accepted Artifacts (Final C4 Hashes)
Scope Summary✅ 002B1 Record Freeze (new commit e689274)
✅ 002B2 Implementation (C4 acceptance)
Review ClosureAll reviewers approved C4 with no P0/P1:
Accepted BoundaryPhase 00 real synthetic probe for owner-installed ffprobe (external-only, Gyan 8.1.2). Important Notes
Co-authored by Claude Haiku 4.5 |
4 tasks
4 tasks
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
Summary
Delivers Phase 00 foundation: frozen specifications/decisions, repository scaffold (VID-IMPL-P00-001), hostile-path preflight acceptance (VID-IMPL-P00-002A), and contract bundle with fail-closed adapter (VID-IMPL-P00-002B1).
Accepted decisions and evidence:
E4B7D0A717E9A4DE2D3675A038D5BE739CCF2CFA3D0A179A4821ABA3EE78AD1D0C6A9056083BFC741B49DE908F74597D9BD8546B69EB75AE8C342B6EA06E2851032BB40DF447DF8771897F63F59AE576484BB7796874BB35DBF4971C28884E4CF78BF8A7AF8616B913D03539EB66ACE6BF670F80C685E791521E395396F3397FTest Evidence
Scope and Boundaries
Included:
NOT Included:
Commits
3396962: Planning/Specification Freeze (58 files)3d22ce3: Repository Scaffold + 002A (19 files)c0f91ca: 002B1 Contract Bundle (1558 files)Relates to: #19, #29, #30, #31
Ready for review. Do not merge until all review gates pass.
🤖 Generated with Phase 00 Delivery Automation