TRU-23 & TRU-15: Introducing new attestation storage structure and expiry logic#21
Open
tusharojha wants to merge 7 commits intoTrueNetworkIO:raman_testnet_parafrom
Open
TRU-23 & TRU-15: Introducing new attestation storage structure and expiry logic#21tusharojha wants to merge 7 commits intoTrueNetworkIO:raman_testnet_parafrom
tusharojha wants to merge 7 commits intoTrueNetworkIO:raman_testnet_parafrom
Conversation
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
PR: Enhanced Attestation Storage with Block Metadata and Expiry Logic
What This PR Does
This PR enhances the attestation system by adding essential metadata tracking and lifecycle management capabilities to improve traceability and enable time-bound attestations.
Key Changes
🔍 Block-Level Traceability (TRU-23)
⏰ Attestation Lifecycle Management (TRU-15)
Why These Changes Matter
Before: Attestations lacked traceability and had no expiry mechanism
After: Full audit trail with block-level tracking and flexible lifecycle management
What's Implemented
✅ Block number and signer storage
✅ Expiry timestamp functionality
✅ Attestation update capability
✅ Expired attestation handling
Issues: [TRU-23](https://linear.app/truenetwork/issue/TRU-23) • [TRU-15](https://linear.app/truenetwork/issue/TRU-15)