Skip to content

Newsletter #25 fixes: remove Vector dup, fix dates, correct NIP-F prefix#98

Merged
Datawav merged 1 commit into
mainfrom
newsletter/2026-06-03-fixes-v2
Jun 4, 2026
Merged

Newsletter #25 fixes: remove Vector dup, fix dates, correct NIP-F prefix#98
Datawav merged 1 commit into
mainfrom
newsletter/2026-06-03-fixes-v2

Conversation

@Datawav

@Datawav Datawav commented Jun 4, 2026

Copy link
Copy Markdown
Collaborator

Three post-publish corrections to Newsletter #25:

  1. Remove Vector v0.4.0 from Top stories — already covered in Newsletter Improve fetch_project_updates.py with commits, open PRs, and auto-detection #24 (Tor, NIP-46 signers, MCP, emoji packs, wallpapers, swipe-to-reply). Repeat coverage violates the no-duplication rule.

  2. Convert all ISO dates (YYYY-MM-DD) to prose format in newsletter body — "2026-06-01" → "June 1", etc. Frontmatter dates remain ISO (Hugo requirement).

  3. Correct NIP-F prefix explanation — NIP-F0–NIP-FF are plain hex-numbered NIPs (same as NIP-0A–NIP-0D), not "experimental NIPs awaiting numeric assignment." The 0–FF hex range serves as overflow now that 01–99 decimal is filling up. Verified against nostr-protocol/nips README.

After merge: edit the kind 30023 long-form on Nostr using the same d tag.

…t ISO dates to prose, correct NIP-F prefix explanation
@Datawav Datawav merged commit 0e4403a into main Jun 4, 2026
1 check passed
@Datawav Datawav deleted the newsletter/2026-06-03-fixes-v2 branch June 4, 2026 08:43
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant