parallel-schedule

Go License

中文

A lightweight Go parallel task scheduling framework based on DAG (Directed Acyclic Graph) that automatically analyzes dependencies and maximizes parallel execution.

Features

  • Auto Scheduling — Just define dependencies, the framework automatically performs topological sorting and maximizes parallel execution
  • Dynamic Topological Sort — Not BFS layer-by-layer execution, avoids inter-layer blocking and improves concurrency
  • Cycle Detection — DFS cycle detection before launch, fail fast
  • Error Interruption — When any step fails, no new subsequent steps are triggered, error is returned
  • Panic Recovery — Panics inside goroutines are captured and converted to errors
  • Dependency Graph Generation — Generate Mermaid flowcharts to visualize dependencies

Installation

go get github.com/duskbat/parallel-schedule

Quick Start

1. Define Data Bus

The data bus is used to pass data between steps, defined by the user:

type MyDataBus struct {
    UserID   int
    UserName string
    Result   string
}

2. Implement Step Interface

Each step implements the Step interface. Note that each step must be a distinct type (the type name is used as the scheduling key):

type StepFetchUser struct {
    Data *MyDataBus
}

func (s *StepFetchUser) Process(ctx context.Context) error {
    s.Data.UserName = "Alice"
    return nil
}

type StepFetchOrder struct {
    Data *MyDataBus
}

func (s *StepFetchOrder) Process(ctx context.Context) error {
    s.Data.Result = fmt.Sprintf("order of %s", s.Data.UserName)
    return nil
}

3. Define Dependencies and Launch

bus := &MyDataBus{UserID: 1}

s1 := &StepFetchUser{Data: bus}
s2 := &StepFetchOrder{Data: bus}
s3 := &StepNotify{Data: bus}

err := parallel.InitScheduler().
    AddDependency(s1, s2).  // s2 runs after s1
    AddDependency(s1, s3).  // s3 runs after s1 (s2 and s3 run in parallel)
    Launch(context.Background())

if err != nil {
    log.Fatal(err)
}

Execution flow for the above dependencies:

flowchart LR
    StepFetchUser --> StepFetchOrder
    StepFetchUser --> StepNotify
Loading

4. Generate Dependency Graph (Optional)

Generate Mermaid flowchart files during development:

scheduler := parallel.InitScheduler().
    AddDependency(s1, s2).
    AddDependency(s1, s3)

scheduler.GenerateGraphLR("graph.md") // left to right
scheduler.GenerateGraphTB("graph.md") // top to bottom

Remove the GenerateGraph call after generation, as it calls os.Exit(1).

Design

Scheduling Flow

  1. Build adjacency list and in-degree table
  2. DFS cycle detection
  3. Launch all nodes with in-degree 0 (nodes without dependencies run in parallel)
  4. Completed nodes are put into a finish queue (channel), consuming the queue triggers subsequent nodes
  5. Adjacent nodes are executed asynchronously as soon as their in-degree reaches 0
  6. Ends when all nodes complete or an error occurs

Why Not BFS

BFS executes layer by layer with synchronization blocking between layers. This framework uses dynamic topological sorting — completed nodes immediately trigger successors, and each node's actual execution time dynamically affects scheduling order, maximizing parallelism.

Project Structure

parallel/
├── schedule.go        # Scheduler core
├── step.go            # Step interface
├── error.go           # PanicError type
├── generate_graph.go  # Mermaid graph generation
└── schedule_test.go   # Tests

License

MIT - Copyright (c) 2025 Weiye Mu

About

No description, website, or topics provided.

Resources

Stars

1 star

Watchers

1 watching

Forks

Releases

Packages

Used by

Contributors

Languages