Skip to content

Package the alpha5 business handoff - #58

Merged
veil-chow-fyaic merged 3 commits into
mainfrom
agent/business-handoff-alpha5
Aug 12, 2026
Merged

veil-chow-fyaic merged 3 commits into
mainfrom
agent/business-handoff-alpha5

Conversation

@veil-chow-fyaic

@veil-chow-fyaic veil-chow-fyaic commented Aug 12, 2026

Copy link
Copy Markdown
Collaborator

What changed

  • Reframes the README for business users with a release PDF entry point, five screenshot-backed outcomes, role-based usage paths and a plain-language progress table.
  • Adds a one-command isolated business demo bootstrap that refreshes all four official sources and verifies active screening, readiness and the synthetic CRM before declaring success.
  • Adds a scoped 95/100 business-demo and synthetic-integration handoff scorecard plus a separate technical handoff with engineering evidence and production blockers.
  • Adds same-run REST/CLI/MCP parity evidence and updates package, API and Compose metadata to 0.1.0a5.
  • Keeps repository-owned synthetic source evidence usable for a multi-day evaluation and safely upgrades the exact legacy demo registration while preserving the independent 48-hour official-source freshness gate.

Why

The implemented prototype was technically well evidenced but difficult for a business team to receive and understand from the repository front page. A long-running local demo also became unavailable after two hours because the synthetic bootstrap source inherited an overly short freshness window.

User impact

A business evaluator can now clone the tagged release, run ./scripts/start_business_demo.sh, open the synthetic CRM, and understand the expected HOLD / REQUEST_EVIDENCE / MONITOR outcomes. CRM, non-CRM, CLI and Agent users have direct handoff paths. The 95/100 label is explicitly limited to demonstration and synthetic integration readiness; it is not a production or legal-fitness claim.

Validation

  • ./scripts/check.sh: 2,088 passed; 100% statement and branch coverage; contract, docs, OpenAPI and package build gates passed.
  • Complete local Compose compatibility gate passed on isolated ports, including the bounded legacy registration upgrade and zero-residue cleanup.
  • Fresh isolated tradesieve-delivery-check Compose deployment built 0.1.0-alpha.5, activated the four official sources and passed active-screening/readiness/CRM checks.
  • Live CRM click returned RED / HOLD with source-native evidence.
  • REST and MCP returned the same active bundle and RED / HOLD; invalid MCP input was rejected.
  • Updated 14-page PDF was rendered to PNG and visually inspected page by page.
  • All GitHub-hosted checks passed, including Compose and three independent PostgreSQL 18.4 gates.

@veil-chow-fyaic
veil-chow-fyaic marked this pull request as ready for review August 12, 2026 06:31
@veil-chow-fyaic
veil-chow-fyaic merged commit b3aa2b7 into main Aug 12, 2026
7 checks passed
@veil-chow-fyaic
veil-chow-fyaic deleted the agent/business-handoff-alpha5 branch August 12, 2026 06:31
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant