Interconnection Queue Tracker

Search generator interconnection queue projects across US ISOs/RTOs: the public list of power projects waiting to connect to the grid.

Live ISOs: ERCOT, MISO, PJM, CAISO, SPP, NYISO, ISO-NE, each from that market’s public queue report, fetched directly from each ISO’s public data source.


Project layout

interconnection-queue-tracker/
├── web/                  # Next.js app (deploy this on Railway)
│   ├── app/              # routes, layout, metadata
│   ├── components/       # UI
│   ├── data/             # curated fallback JSON
│   └── lib/              # DB access, analytics, markets
├── services/fetcher/     # Python job: loads ISO feeds into Postgres
├── scripts/              # local fetch helper
├── docker-compose.yml
├── Dockerfile.web
└── .github/workflows/    # daily fetch CI

Quick start

docker compose up -d postgres

cd web && cp .env.local.example .env.local && npm install && npm run dev

# Load all ISO queues (~2-5 min)
docker compose --profile fetch run --rm fetcher

Open http://localhost:3000

Fetch specific ISOs only

FETCH_MARKETS=PJM,CAISO docker compose --profile fetch run --rm fetcher

Or locally without Docker:

./scripts/fetch-queues.sh

Stack

Layer Tech
UI Next.js 16, Tailwind v4
Data Postgres (queue_projects, queue_market_snapshots)
Fetcher Python (direct ISO feeds)

The web app reads Postgres directly (no separate API service). The ERCOT large-load panel is the exception: it fetches a pre-built snapshot from kardashev-data over HTTP.


Supported markets

ISO/RTO Source
ERCOT GIS Report
MISO GI interactive queue
PJM Public interconnection queue export
CAISO Public queue report
SPP Generation interconnection summary
NYISO Interconnection queue
ISO-NE Interconnection queue

Not yet: IESO, AESO


Environment

Web (web/.env.local)

Variable Example Purpose
DATABASE_URL postgres://queue:queue@127.0.0.1:5434/queue Live queue data
CURATED_PATH ./data/curated.json Fallback signals
NEXT_PUBLIC_SITE_URL https://your-app.up.railway.app OG metadata
KARDASHEV_DATA_URL https://data.kardashevlabs.org Optional. Source for the ERCOT large-load panel; defaults to the hosted kardashev-data service if unset.

Fetcher (services/fetcher)

Variable Purpose
DATABASE_URL Required. Postgres connection string.
FETCH_MARKETS Optional. Comma-separated subset of markets to fetch (default: all seven).
PJM_QUEUE_SUBSCRIPTION_KEY Required for PJM. Public subscription key used by PJM's interconnection queue web app (not a member API key). Without it, PJM is skipped.

Production

Railway (web only)

  1. Create a Railway project with PostgreSQL + a web service.
  2. Set the web service root directory to web.
  3. Link Postgres → injects DATABASE_URL.
  4. Set NEXT_PUBLIC_SITE_URL to your Railway URL.
  5. Add GitHub secrets DATABASE_URL (Railway Postgres public URL) and PJM_QUEUE_SUBSCRIPTION_KEY for the daily fetch workflow (without the PJM key, PJM is skipped).
  6. Run the fetcher once before launch (Actions → “Fetch ISO queues” → Run workflow).

Docker

docker compose up -d postgres web
docker compose --profile fetch run --rm fetcher

Scheduled fetch (daily)

GitHub Actions runs at 06:00 UTC; needs repo secret DATABASE_URL.

Docker cron (self-hosted):

docker compose --profile cron up -d fetcher-cron

Launch checklist

  • Postgres running with DATABASE_URL set on web
  • Fetcher has populated queue_projects at least once
  • NEXT_PUBLIC_SITE_URL matches your public URL
  • npm run lint and npm run build pass in web/

About

Search generator interconnection queue projects across US ISOs/RTOs - the public list of power projects waiting to connect to the grid.

Topics

Resources

Contributing

Stars

0 stars

Watchers

0 watching

Forks

Releases

No releases published

Packages

 
 
 

Contributors