docs: Event Date vs Install Date reporting views (LIN-2101) - #161
Open
RathodDarshil wants to merge 2 commits into
Open
docs: Event Date vs Install Date reporting views (LIN-2101)#161RathodDarshil wants to merge 2 commits into
RathodDarshil wants to merge 2 commits into
Conversation
New features/reporting-time page documenting the Report by toggle: the two date bases, which metrics change, where the toggle applies, cohort maturity behavior on recent days, and remaining ad-network reconciliation gaps. Adds the reporting query parameter to the Reporting API page.
Adds a section explaining why Install Date is disabled in the Retargeting view: networks date retargeting conversions to the re-engagement interaction (= event date), matching AppsFlyer/Adjust conventions of anchoring retargeting cohorts to re-engagement/reattribution date. Scopes the Google/ Meta alignment claim to user-acquisition conversions and adds the practical pairing rule (UA -> Install Date, Retargeting -> Event Date).
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
Documents the new Report by: Event Date | Install Date toggle shipping with LIN-2101.
reportingquery parameter (event_datedefault |install_date).Screenshots of the dashboard toggle to be added in a follow-up once the dashboard PR is deployed to staging.
Note: hold merging until the feature PRs are deployed (hazelnut https://github.com/linkrunner-labs/hazelnut/pull/647 + ts-backend + dashboard), since docs publish to prod on merge.