Skip to content
Merged
Show file tree
Hide file tree
Changes from all commits
Commits
File filter

Filter by extension

Filter by extension

Conversations
Failed to load comments.
Loading
Jump to
Jump to file
Failed to load files.
Loading
Diff view
Diff view
9 changes: 9 additions & 0 deletions docs/architecture/rfcs/README.md
Original file line number Diff line number Diff line change
Expand Up @@ -287,6 +287,15 @@ changes.
Lark operation cards. Direct Goal workspace navigation and Overview compose
bounded graph/acceptance readback, source navigation and snapshot export. General cross-channel disclosure,
living documents and governed amendment/settlement review remain open.
- [Live Team Workspace v0](live-team-workspace-v0.md)
([中文版](live-team-workspace-v0.zh-CN.md))
- **RFC status:** Draft presentation slice under intelligent presentation.
- **Delivery on `main`:** Design proposal only; no live team-stream qualification.
- **Current boundary:** A command surface plus spatial research studio, evidence
handoff motion, conclusion revision and replay. L1 requires one real
objection→revision→acceptance→adoption journey with evidence and intervention/stop
feedback in packaged UI; L2 requires original-coordinator two-cycle acceptance;
L3 qualifies semantic zoom and display scale. No new scheduler or authority.
- [Human Attention Wishlist v0](human-attention-wishlist-v0.md)
([中文版](human-attention-wishlist-v0.zh-CN.md))
- **RFC status:** Draft, under maintainer review.
Expand Down
Original file line number Diff line number Diff line change
Expand Up @@ -673,6 +673,18 @@ canonical facts, authority, evidence status, or whether an effect committed.
Adaptive policies must be inspectable and resettable. Their outputs carry
reason codes and preserve a deterministic fallback.

### 8.7 Live team workspace

[Live Team Workspace v0](live-team-workspace-v0.md) specifies the S5/R2 research
journey: a command surface and spatial studio share typed facts with the list,
semantic zoom and historical replay. Purposeful motion is a product objective;
registration, execution, return, independent acceptance and requester adoption
remain distinct. Preserve source/revision lineage and uncertainty; never infer
activity from decorative motion or confidence from agreement counts. This is a
Draft presentation slice, not a shipped team stream or new scheduling authority.
Its L1–L3 plan and V1–V7 acceptance extend this RFC's Stage 3 presentation journey;
they do not close cross-channel or governed settlement acceptance here.

## 9. Coverage across the long-horizon lifecycle

| Phase | Intelligent surface responsibility |
Expand Down
Original file line number Diff line number Diff line change
Expand Up @@ -551,6 +551,15 @@ type PresentationArtifactPlan = {

Adaptive policy 必须 inspectable、resettable,其输出携带 reason codes,并始终保留 deterministic fallback。

### 8.7 团队实时工作区

[团队实时工作区 v0](live-team-workspace-v0.zh-CN.md) 描述 S5/R2 投研旅程:
指挥台与空间工作室同列表、语义缩放和历史回放共用 typed 事实。有目的的动态
是产品目标;注册、执行、返回、独立验收与请求方采用保持分离。保留来源 / 版本
谱系和不确定性,不能由装饰动态推断活动或由共识人数推断置信度。这是 Draft
展示切片,不是已交付的团队流,也不新增调度权限。其 L1–L3 计划与 V1–V7 验收
展开本 RFC Stage 3 的展示旅程,不关闭本文跨渠道或受治理 settlement 验收。

## 9. 覆盖长程工作的完整生命周期

| 阶段 | 智能化界面的职责 |
Expand Down
410 changes: 410 additions & 0 deletions docs/architecture/rfcs/live-team-workspace-v0.md

Large diffs are not rendered by default.

330 changes: 330 additions & 0 deletions docs/architecture/rfcs/live-team-workspace-v0.zh-CN.md

Large diffs are not rendered by default.

16 changes: 15 additions & 1 deletion docs/architecture/rfcs/loopx-overall-roadmap-v0.md
Original file line number Diff line number Diff line change
Expand Up @@ -39,7 +39,7 @@ P0 blocks correctness or continuity in the current user journey. P1 enables repe
| **S2 Typed kernel and durable authority · P0/P1** | Effect/Todo/quota/recovery owners, TS migration and store candidates exist; writer cutover/provider promotion remain incomplete | Migrate one real transaction/recovery lifecycle at a time, with semantic counterexamples before cutover/deletion. R1 correctness precedes migration volume. Require real backend, concurrency/fence, ambiguous commit, retention/export recovery, bridge costs and D1–D3 evidence |
| **S3 Goal planning and multi-Agent collaboration · P0/P1** | Vision/replan, peer frontiers, claim/lease, directory, manager_context and explicit continuation exist; general handoff/shared amendment remain incomplete | R2 proves peer dependency; R3 closes parallel joins, pipelines, help/review, continuation and automatic return; R4 delivers one intent-preserving amendment class. Cover cycles, invalidated inputs, rejection/deferral, lease transfer, competing bases and aggregate acceptance |
| **S4 Runtime/host/daemon · P0/P1** | Attached/managed, Turn, broker, runtime connectors and Desktop repairs exist; registration does not establish executable capacity | Qualify multi-Turn supervision for one real supported combination; restart/cancel/drain/stop retain work and fence old executors. Then expand host parity, unique service-profile ownership, clean installation and upgrades; show unsupported adapter capabilities |
| **S5 Frontend, Lark and human interaction · P0/P1** | Local chat, settings, proposals and partial Goal Channel verticals exist; shared audience/session/work readback needs qualification | One journey spans settings, work graph, handoff, blockers, cost, corrections, artifacts and return. Shared typed projections; reconnect/repeated-click/stale/original-route cases. Then intelligent review, keyboard accessibility, bilingual terminology, actionable errors and offline degradation; interrupt only for actual decisions |
| **S5 Frontend, Lark and human interaction · P0/P1** | Local chat, settings, proposals and partial Goal Channel verticals exist; shared audience/session/work readback needs qualification | One journey spans settings, work graph, handoff, blockers, cost, corrections, artifacts and return. Shared typed projections; reconnect/repeated-click/stale/original-route cases. [Live team workspace](live-team-workspace-v0.md) makes exchange, revision and original-coordinator continuation visible. Then intelligent review, keyboard accessibility, bilingual terminology, actionable errors and offline degradation; interrupt only for actual decisions |
| **S6 Materials, evidence, memory and learning · P1** | Authority registry, material lifecycle/frontier, decision context, reward memory and turn recall exist; direction baseline and parts of attribution remain proposed | Connect material revision→same-Agent read→decision reference→artifact/outcome. Expose expiry/revocation/source loss and forgetting policy. Handoff preserves decision-relevant summaries and authorized artifacts; qualify OpenViking/Obelisk as optional providers. Prove causal utility with controls, not relevance alone |
| **S7 Budget, scheduling and fleet scale · P0 observation/P1–P2 expansion** | Quota/scheduler and partial usage aggregates exist; full provider cost, distributed reservations and hundred-Agent concurrency need evidence | Separate configured budget, admission, consumption and estimates; unknown is not zero and replay cannot double-charge. R7 pagination/bounded summaries, provider/host limits, fairness, backpressure, event wake and isolation; report registration/activity/throughput and cost per accepted outcome separately |
| **S8 Capabilities, extensions and domain integration · P1/P2** | Capability catalog, extension lifecycle, hooks, engineering/research/content/office capabilities and computer-use contracts exist | First exercise the shared control plane with existing issue-fix/PR-review and material/research callers. Every provider has readiness/version/permissions/default-off/uninstall/rollback/isolation and real-entry evidence. New domain effects start with one simulated operation, not a marketplace or workflow DSL |
Expand Down Expand Up @@ -295,6 +295,20 @@ This qualifies a local execution-facts readback, not the full R2 ladder: assignm
receipt integration, provisioning, remote probes, two-cycle continuation and Lark
qualification remain open under their existing owners.

**Live team experience is a core S5 outcome.** The [Live Team Workspace
RFC](live-team-workspace-v0.md) joins a precise command surface with a spatial
research studio: visible artifact exchange, sourced disagreement, conclusion
revision, replay and semantic zoom. It is a presentation slice of existing
owners, not a second orchestrator. The next complete frontend slice connects
one real objection→revision→independent acceptance→requester adoption episode
to the packaged workspace, with inspectable evidence, intervention/stop feedback,
independent CLI readback and honest degraded states.
Then qualify the original research coordinator through the same two real cycles
required above. Existing runtime admission/provider repairs retain their owner;
a synthetic scene is not readiness evidence. Expand display load 10→30→100 only
under frozen rendering/attention budgets, separately from live R7 concurrency.
Current status is design proposal; no G1 or default-screen promotion.

### R3: Semantic Requests and Automatic Return

- **Owner:** manager RFC M2/M3; migrate existing `manager_context` request/tracking/return into one typed collaboration transaction, incorporating the #4094 adapter.
Expand Down
11 changes: 10 additions & 1 deletion docs/architecture/rfcs/loopx-overall-roadmap-v0.zh-CN.md
Original file line number Diff line number Diff line change
Expand Up @@ -39,7 +39,7 @@ LoopX 的目标是让人用本地前端或 Lark 提出、修订和验收复杂
| **S2 typed 内核与 durable authority · P0/P1** | Effect/Todo/quota/recovery owner、TS 事务迁移与 store 候选已存在;writer 和 provider 晋升仍未全闭合 | 每次迁移一个真实事务/恢复生命周期,先语义反例再切换/删除旧 owner;R1 正确性先于迁移数量。真实 backend、并发/fence、ambiguous commit、保留/导出恢复、bridge 成本及 D1–D3 资格 |
| **S3 目标规划与 multi-Agent 协作 · P0/P1** | Vision/replan、peer frontier、claim/lease、directory、manager_context 和显式接续有基础;通用 handoff/共享修订未闭环 | R2 必须证明 peer 依赖;R3 完成并行汇合、流水线、求助/复核、接续、自动回报;R4 做一个保持 intent 的 amendment class。检查依赖环、输入失效、拒绝/延期、lease 转移、同基线竞争及 aggregate acceptance |
| **S4 runtime/host/daemon · P0/P1** | attached/managed、Turn、broker、runtime connector 和 Desktop 修复存在;“registered”不等于可执行 | 选择一个真实合格组合完成多 Turn supervision;restart/cancel/drain/stop 不丢工作且旧 executor 被 fence。之后扩 host parity、service-profile 唯一 owner、干净安装与版本升级;按 adapter 能力显示不支持项 |
| **S5 前端、Lark 与人机交互 · P0/P1** | 本地对话、settings、proposal 和部分 Goal Channel vertical 已有;统一受众/会话/工作回读仍需资格 | 用一个团队旅程贯穿设置、工作图、handoff、阻塞、成本、修订、产物和回报;共享 typed projection,验证重连/重复点击/stale/原路反馈。再做 intelligent review、无障碍键盘流程、中英术语、错误可恢复和离线降级;只在真实决策处打断人 |
| **S5 前端、Lark 与人机交互 · P0/P1** | 本地对话、settings、proposal 和部分 Goal Channel vertical 已有;统一受众/会话/工作回读仍需资格 | 用一个团队旅程贯穿设置、工作图、handoff、阻塞、成本、修订、产物和回报;共享 typed projection,验证重连/重复点击/stale/原路反馈。再做 intelligent review、无障碍键盘流程、中英术语、错误可恢复和离线降级;只在真实决策处打断人;[团队实时工作区](live-team-workspace-v0.zh-CN.md)让交换、修订与原协调员继续推进可见 |
| **S6 材料、证据、记忆与学习 · P1** | authority registry、material lifecycle/frontier、decision context、reward memory、turn recall 已有;方向基线和部分归因仍是提案 | 先打通“材料 revision→同 Agent 阅读→决策引用→产物/结果”;失效、撤销、来源消失与遗忘策略可回读。handoff 保存影响决策的摘要与授权 artifact;OpenViking/Obelisk 按可选 provider 资格化。utility 的因果收益另以对照证明,不把相关性当提升 |
| **S7 预算、调度与 fleet 规模 · P0 观测/P1–P2 扩展** | quota/scheduler 与部分 usage aggregate 存在;全 provider 成本、分布式资源预留及百 Agent 并发尚需证据 | 先区分配置预算、准入、消耗与估算;未知成本不记零、重复事件不双记。R7 分页/有界摘要、provider/host 限流、公平性、背压、事件唤醒与失败隔离;分别报告注册数/活跃数/吞吐量和每个验收成果成本 |
| **S8 能力、扩展与领域集成 · P1/P2** | 已有 capability catalog、extension 生命周期、hook、工程/研究/content/office 能力及 computer-use 合同 | 优先用现有 issue-fix/PR-review 和材料/研究 caller 检验共享控制面;每个 provider 带 readiness、版本、权限、默认关闭、卸载/回滚、失败隔离与真实入口证据。新 domain effect 从模拟单操作闭环开始,不先建市场或通用工作流 DSL |
Expand Down Expand Up @@ -272,6 +272,15 @@ executor/profile 检查启动条件。任务准入、当前 pinned 验收绑定
检查,不新增状态账本,也不启动执行。这只验收本地执行事实的读回;计划分配回执
整合、通用创建、远端探针、两轮持续协作及 Lark 等价仍由原 owner 继续推进。

**团队现场是 S5 核心产品目标。** [团队实时工作区 RFC](live-team-workspace-v0.zh-CN.md)
融合精确指挥台与空间研究工作室:展示产物交换、有来源的分歧、结论修订、回放与
语义缩放。它复用既有 owner,不建立第二套编排。下一完整前端切片在打包工作区
呈现一次真实异议→修订→独立验收→请求方采用,提供可检查证据、干预 / 停止
反馈、独立 CLI 回读与真实降级状态;随后按上述标准验收原投研 coordinator 的两轮真实协作。既有 runtime
准入 / provider 修复保留原 owner;合成场景不能充当 readiness 证据。展示负载
10→30→100 在测前冻结渲染 / 注意力预算,和 R7 实际并发分开资格化。当前为设计
提案,不晋升 G1 或默认首屏。

### R3:语义请求与自动回报

- **Owner:** 管家 RFC M2/M3;从已有 `manager_context` request/tracking/return 迁移到单一 typed collaboration 事务,纳入 #4094 adapter。
Expand Down
Loading