Skip to content

chore(fork): restore the Cat Café governance overlay - #90

Closed
mindfn wants to merge 4 commits into
rebuild/develop-base-harness-only-v2-20260807from
rebuild/develop-base-fork-overlay-20260807
Closed

chore(fork): restore the Cat Café governance overlay#90
mindfn wants to merge 4 commits into
rebuild/develop-base-harness-only-v2-20260807from
rebuild/develop-base-fork-overlay-20260807

Conversation

@mindfn

@mindfn mindfn commented Aug 7, 2026

Copy link
Copy Markdown
Owner

Purpose

Restore only the Cat Café fork overlay after the complete reusable Harness stack.

This is PR 2 of 2 and is intentionally stacked on PR #89 so its review diff contains fork-only policy and configuration changes.

Exact provenance

Scope

  • Runtime-provided agent identity and fork review and planning safeguards
  • develop_base direct-commit allowlist with fail-closed pre-commit enforcement
  • Cat Café ROADMAP and brand overlay
  • eval:friction weekly cadence and matching tests
  • Net diff: 19 files, +669 / -66
  • Runtime source delta under packages/api/src, packages/web/src, and packages/shared/src: zero

Risk

  • Behavior: medium — repository governance and review routing
  • Data: low — no runtime data migration in this overlay
  • Security: medium — pre-commit fail-closed write protection
  • Contract: medium — fork governance and cadence contracts
  • Irreversible: low — isolated stacked branch; no runtime or production data mutation

Validation

  • Targeted fork suite: 88/88 passed
  • Full bash ./scripts/pre-merge-check.sh --no-rebase: PASS on exact head 83247ebe0 in 1108 seconds
  • Range-diff: three commits exact-equivalent; the sole contextual delta retains latest-main stateful-migration guards
  • Cross-family review: Fable APPROVED the exact feat(f257): restore the complete Harness stack #89 and chore(fork): restore the Cat Café governance overlay #90 stack, 0 P1 / 0 P2 / 1 cosmetic P3
  • Cloud review not selected: the stateful local reviewer independently covered the final overlay, hook composition, and separation boundary

Merge order

  1. Merge PR feat(f257): restore the complete Harness stack #89 first.
  2. Retarget this PR from the PR feat(f257): restore the complete Harness stack #89 branch to develop_base.
  3. Re-read the resulting 19-file fork-only diff and confirm GitHub reports it clean.
  4. Merge this PR second.

Do not merge this PR into the Harness feature branch.

@mindfn

mindfn commented Aug 7, 2026

Copy link
Copy Markdown
Owner Author

Local cross-family review evidence

  • Reviewer: Fable (non-author, cross-provider)
  • Reviewed exact SHA: 5e464449007ab501fa3c695369d24763112e62c8
  • Verdict: APPROVED — 0 P1 / 0 P2 / 0 P3
  • Full gate: PASS (1003 seconds)
  • Runtime source delta: 0 under packages/api/src, packages/web/src, and packages/shared/src
  • Online Codex review: skipped per operator direction for fork-internal PRs

Merge order remains: merge PR #89 first, retarget this PR to develop_base, re-read the fork-only diff, then merge PR #90.

@mindfn
mindfn marked this pull request as ready for review August 7, 2026 14:39
@mindfn
mindfn marked this pull request as draft August 10, 2026 07:58
@mindfn
mindfn force-pushed the rebuild/develop-base-harness-only-v2-20260807 branch from 197c6da to e17b56f Compare August 10, 2026 09:16
Maine Coon Yanyan and others added 4 commits August 10, 2026 17:18
Why: the rebuilt develop_base must retain Cat Cafe runtime identity authority and the fork-specific planning/review safeguards without carrying the old mixed commit history.

[砚砚/gpt-5.6-sol🐾]
Why: develop_base is the live runtime baseline, so only the five explicitly governed shared-state files may be committed directly; code continues through feature PRs.

Also restores the fork ROADMAP identity/status overlay without reviving obsolete TeamAct or execution-artifact history.

[砚砚/gpt-5.6-sol🐾]
Why: three consecutive zero-signal 72h windows showed the 3-day schedule generated noise; weekly remains within the 168h SLA and is independently reversible.

[砚砚/gpt-5.6-sol🐾]
Why: the rebuilt fork overlay runs on the latest index-aware Biome pre-commit guard, so its isolated E2E fixture must provide the package and binary filesystem contract before branch-routing assertions can execute.
@mindfn
mindfn force-pushed the rebuild/develop-base-fork-overlay-20260807 branch from 5e46444 to 83247eb Compare August 10, 2026 09:39
@mindfn

mindfn commented Aug 10, 2026

Copy link
Copy Markdown
Owner Author

Local cross-family review evidence (mechanical transcription): Fable APPROVED the exact stacked candidates PR #89 e17b56f and PR #90 83247eb with 0 P1, 0 P2, and one cosmetic P3. Durable thread verdict message: 0001786355734876-000516-1bd65efb. Current GitHub heads matched both reviewed SHAs at transcription time; both exact-head full gates passed.

@mindfn
mindfn marked this pull request as ready for review August 10, 2026 09:58
@mindfn

mindfn commented Aug 14, 2026

Copy link
Copy Markdown
Owner Author

Closing as obsolete. The PR reconstructed historical fork-local Cat Café naming as if it were a current product/instance contract, but no current requirement or operator decision supports that premise. The repository and current collaboration identity remain Clowder AI. The replacement branch topology is maintained separately; this PR must not be merged. No branch deletion is requested.

@mindfn mindfn closed this Aug 14, 2026
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant