Skip to content

fix(objectql): an in-process engine verb refuses an object name the registry does not resolve (#21516) #41776

fix(objectql): an in-process engine verb refuses an object name the registry does not resolve (#21516)

fix(objectql): an in-process engine verb refuses an object name the registry does not resolve (#21516) #41776

Triggered via pull request October 3, 2026 05:32
Status Cancelled
Total duration 12m 52s
Artifacts 8

ci.yml

on: pull_request
Matrix: dogfood
Matrix: test
Dogfood Verify CLI
7m 18s
Dogfood Verify CLI
Temporal Conformance (live PG + MySQL)
10m 15s
Temporal Conformance (live PG + MySQL)
Build Core
7m 16s
Build Core
Build Docs
0s
Build Docs
Console Pin Gate
0s
Console Pin Gate
Test Core
20s
Test Core
Dogfood Regression Gate
19s
Dogfood Regression Gate
Fit to window
Zoom out
Zoom in

Annotations

26 errors and 15 notices
Test Core (4/6)
Process completed with exit code 1.
Test Core (4/6)
command (/home/runner/work/objectstack/objectstack/packages/services/service-settings) /opt/hostedtoolcache/node/22.23.3/x64/bin/pnpm run test exited (1)
Test Core (2/6)
Process completed with exit code 1.
Test Core (2/6)
command (/home/runner/work/objectstack/objectstack/packages/triggers/trigger-record-change) /opt/hostedtoolcache/node/22.23.3/x64/bin/pnpm run test exited (1)
Dogfood Regression Gate (1/3)
Canceling since a higher priority waiting request for ci-CI-pull_request-21545 exists
Dogfood Regression Gate (3/3)
Canceling since a higher priority waiting request for ci-CI-pull_request-21545 exists
Dogfood Regression Gate (3/3)
Process completed with exit code 1.
Dogfood Regression Gate (3/3)
command (/home/runner/work/objectstack/objectstack/packages/qa/dogfood) /opt/hostedtoolcache/node/22.23.3/x64/bin/pnpm run test exited (1)
Test Core (5/6)
Canceling since a higher priority waiting request for ci-CI-pull_request-21545 exists
Test Core (5/6)
The operation was canceled.
Dogfood Regression Gate (2/3)
Canceling since a higher priority waiting request for ci-CI-pull_request-21545 exists
Dogfood Regression Gate (2/3)
The operation was canceled.
Temporal Conformance (live PG + MySQL)
Canceling since a higher priority waiting request for ci-CI-pull_request-21545 exists
Temporal Conformance (live PG + MySQL)
The operation was canceled.
Test Core (6/6)
Canceling since a higher priority waiting request for ci-CI-pull_request-21545 exists
Test Core (6/6)
The operation was canceled.
Test Core (1/6)
Canceling since a higher priority waiting request for ci-CI-pull_request-21545 exists
Test Core (1/6)
The operation was canceled.
Test Core (3/6)
Canceling since a higher priority waiting request for ci-CI-pull_request-21545 exists
Test Core (3/6)
The operation was canceled.
Dogfood Regression Gate
Process completed with exit code 1.
Dogfood Regression Gate
Dogfood Regression Gate: 2 of 3 declared shard(s) of dogfood published no positive attestation (dogfood-2-of-3, dogfood-3-of-3) while 1 sibling(s) did (dogfood-1-of-3). The leg was cancelled mid-run, so the missing shard(s) produced no verdict at all — an untested shard is not a passing shard, see #16157.
CI
Canceling since a higher priority waiting request for ci-CI-pull_request-21545 exists
Test Core
Process completed with exit code 1.
Test Core
Test Core: leg test reported result 'failure' — a declared negative is never overridden by a full roster.
Test Core
Test Core: 6 of 6 declared shard(s) of test published no positive attestation (test-1-of-6, test-2-of-6, test-3-of-6, test-4-of-6, test-5-of-6, test-6-of-6). A shard that never ran cannot be counted as passing — see #6082.
filter
"The ubuntu-latest label will migrate to Ubuntu 26 beginning October 19, 2026. For more information, see https://github.com/actions/runner-images/issues/14748"
Test Core (4/6)
"The ubuntu-latest label will migrate to Ubuntu 26 beginning October 19, 2026. For more information, see https://github.com/actions/runner-images/issues/14748"
Build Core
"The ubuntu-latest label will migrate to Ubuntu 26 beginning October 19, 2026. For more information, see https://github.com/actions/runner-images/issues/14748"
Dogfood Verify CLI
"The ubuntu-latest label will migrate to Ubuntu 26 beginning October 19, 2026. For more information, see https://github.com/actions/runner-images/issues/14748"
Test Core (2/6)
"The ubuntu-latest label will migrate to Ubuntu 26 beginning October 19, 2026. For more information, see https://github.com/actions/runner-images/issues/14748"
Dogfood Regression Gate (1/3)
"The ubuntu-latest label will migrate to Ubuntu 26 beginning October 19, 2026. For more information, see https://github.com/actions/runner-images/issues/14748"
Dogfood Regression Gate (3/3)
"The ubuntu-latest label will migrate to Ubuntu 26 beginning October 19, 2026. For more information, see https://github.com/actions/runner-images/issues/14748"
Test Core (5/6)
"The ubuntu-latest label will migrate to Ubuntu 26 beginning October 19, 2026. For more information, see https://github.com/actions/runner-images/issues/14748"
Dogfood Regression Gate (2/3)
"The ubuntu-latest label will migrate to Ubuntu 26 beginning October 19, 2026. For more information, see https://github.com/actions/runner-images/issues/14748"
Temporal Conformance (live PG + MySQL)
"The ubuntu-latest label will migrate to Ubuntu 26 beginning October 19, 2026. For more information, see https://github.com/actions/runner-images/issues/14748"
Test Core (6/6)
"The ubuntu-latest label will migrate to Ubuntu 26 beginning October 19, 2026. For more information, see https://github.com/actions/runner-images/issues/14748"
Test Core (1/6)
"The ubuntu-latest label will migrate to Ubuntu 26 beginning October 19, 2026. For more information, see https://github.com/actions/runner-images/issues/14748"
Test Core (3/6)
"The ubuntu-latest label will migrate to Ubuntu 26 beginning October 19, 2026. For more information, see https://github.com/actions/runner-images/issues/14748"
Dogfood Regression Gate
"The ubuntu-latest label will migrate to Ubuntu 26 beginning October 19, 2026. For more information, see https://github.com/actions/runner-images/issues/14748"
Test Core
"The ubuntu-latest label will migrate to Ubuntu 26 beginning October 19, 2026. For more information, see https://github.com/actions/runner-images/issues/14748"

Artifacts

Produced during runtime
Name Size Digest
build-output
28.8 MB
sha256:3845ae83e2b7573fb33078d57556085aebe330eaa3575886bcb15699cd088319
shard-attest-dogfood-1-of-3
322 Bytes
sha256:84e1d07a1751bd4c8b2b630a4b9fa06d57e3898308f24582b65c7f77623d06c6
shard-attest-dogfood-verify-1-of-1
340 Bytes
sha256:9362763242657157d8a10091bab7e3a044e723ed98032bfb2b195ffec57af096
test-core-run-summary-2-of-6
585 KB
sha256:6342df1d9715222b77a527e4c7964126fdb314a0bfc7cb6bc05b94f28704dda0
test-core-run-summary-4-of-6
451 KB
sha256:f58f7b3accec4d62561d68c12c389756ae625017acab86c349644b0da90f9a59
test-core-timing-table
19.3 KB
sha256:fbf4dfec936d18aef1781715f9ffa8b68003aaf0dd1a5b68222d57f99aa724ed
test-core-timings-2-of-6
14.5 KB
sha256:8d0aeddd2cf6d597acfd457dbdd341c6b01054c6dc79dcd0676cb8ce12451927
test-core-timings-4-of-6
3.56 KB
sha256:b3101189d20811163d3e8c4856d80902e24c7961f6bb52b41e52541494407f0e