Skip to content
Merged
Changes from all commits
Commits
File filter

Filter by extension

Filter by extension

Conversations
Failed to load comments.
Loading
Jump to
Jump to file
Failed to load files.
Loading
Diff view
Diff view
11 changes: 8 additions & 3 deletions integrations/localthought/README.md
Original file line number Diff line number Diff line change
Expand Up @@ -189,12 +189,17 @@ in this repo. What was still missing was narrower: the composed
`localthought/overlays`) only ever declared `GET` operations, so a `PATCH`
never reached Google no matter what the proxy or scope allowed. That catalog
gap is closed by
[overlays#166](https://github.com/localthought/overlays/pull/166) (adds the
[overlays#168](https://github.com/localthought/overlays/pull/168) (adds the
one write operation this lens sends — a partial event update, matching
`applyCalendarEdit`'s `summary`/`description`/`location`/`start`/`end` fields
and `If-Match`) and
[integration-proxy#75](https://github.com/localthought/integration-proxy/pull/75)
(bumps the deployed `DEFAULT_CATALOG_PATH` pin to it). Both need merging and
[integration-proxy#76](https://github.com/localthought/integration-proxy/pull/76)
(bumps the deployed `DEFAULT_CATALOG_PATH` pin to it). overlays#168 also
migrates the underlying base document: `ontola/openapi-directory` removed the
hand-written, read-only `google-calendar/v3` subset the earlier
[overlays#166](https://github.com/localthought/overlays/pull/166) was built
against, replacing it with a regenerated, full `calendar/v3` document
converted from Google's own Discovery document. Both PRs need merging and
the service needs restarting to pick up the new pin before any write reaches
Google. Reconnect existing Google accounts if the wider `calendar.events`
scope wasn't already exercised in this deployment; Calendar reconnection
Expand Down
Loading