Skip to content

Comments

Update openshift/os CI config: extensions/Dockerfile to Containerfile#74887

Merged
openshift-merge-bot[bot] merged 1 commit intoopenshift:mainfrom
cverna:dockerfile-to-containerfile-extensions
Feb 19, 2026
Merged

Update openshift/os CI config: extensions/Dockerfile to Containerfile#74887
openshift-merge-bot[bot] merged 1 commit intoopenshift:mainfrom
cverna:dockerfile-to-containerfile-extensions

Conversation

@cverna
Copy link
Contributor

@cverna cverna commented Feb 13, 2026

Update the dockerfile_path for rhel-coreos-extensions from extensions/Dockerfile to extensions/Containerfile to match the rename in openshift/os PR #1896.

Assisted-by: OpenCode (Opus 4.5)

Update the dockerfile_path for rhel-coreos-extensions from
extensions/Dockerfile to extensions/Containerfile to match the
rename in openshift/os#1896

Assisted-by: OpenCode (Opus 4.5)
@cverna cverna force-pushed the dockerfile-to-containerfile-extensions branch from d315437 to 8a0a7d8 Compare February 13, 2026 17:35
@openshift-ci openshift-ci bot added the approved Indicates a PR has been approved by an approver from all required OWNERS files. label Feb 13, 2026
@openshift-ci-robot
Copy link
Contributor

[REHEARSALNOTIFIER]
@cverna: the pj-rehearse plugin accommodates running rehearsal tests for the changes in this PR. Expand 'Interacting with pj-rehearse' for usage details. The following rehearsable tests have been affected by this change:

Test name Repo Type Reason
pull-ci-openshift-os-master-okd-scos-e2e-aws-ovn openshift/os presubmit Ci-operator config changed
pull-ci-openshift-os-master-okd-scos-images openshift/os presubmit Ci-operator config changed
pull-ci-openshift-os-master-e2e-aws openshift/os presubmit Ci-operator config changed
pull-ci-openshift-os-master-images openshift/os presubmit Ci-operator config changed

Prior to this PR being merged, you will need to either run and acknowledge or opt to skip these rehearsals.

Interacting with pj-rehearse

Comment: /pj-rehearse to run up to 5 rehearsals
Comment: /pj-rehearse skip to opt-out of rehearsals
Comment: /pj-rehearse {test-name}, with each test separated by a space, to run one or more specific rehearsals
Comment: /pj-rehearse more to run up to 10 rehearsals
Comment: /pj-rehearse max to run up to 25 rehearsals
Comment: /pj-rehearse auto-ack to run up to 5 rehearsals, and add the rehearsals-ack label on success
Comment: /pj-rehearse list to get an up-to-date list of affected jobs
Comment: /pj-rehearse abort to abort all active rehearsals
Comment: /pj-rehearse network-access-allowed to allow rehearsals of tests that have the restrict_network_access field set to false. This must be executed by an openshift org member who is not the PR author

Once you are satisfied with the results of the rehearsals, comment: /pj-rehearse ack to unblock merge. When the rehearsals-ack label is present on your PR, merge will no longer be blocked by rehearsals.
If you would like the rehearsals-ack label removed, comment: /pj-rehearse reject to re-block merging.

@openshift-ci-robot
Copy link
Contributor

[REHEARSALNOTIFIER]
@cverna: the pj-rehearse plugin accommodates running rehearsal tests for the changes in this PR. Expand 'Interacting with pj-rehearse' for usage details. The following rehearsable tests have been affected by this change:

Test name Repo Type Reason
pull-ci-openshift-os-master-e2e-aws openshift/os presubmit Ci-operator config changed
pull-ci-openshift-os-master-images openshift/os presubmit Ci-operator config changed
pull-ci-openshift-os-master-okd-scos-e2e-aws-ovn openshift/os presubmit Ci-operator config changed
pull-ci-openshift-os-master-okd-scos-images openshift/os presubmit Ci-operator config changed
Interacting with pj-rehearse

Comment: /pj-rehearse to run up to 5 rehearsals
Comment: /pj-rehearse skip to opt-out of rehearsals
Comment: /pj-rehearse {test-name}, with each test separated by a space, to run one or more specific rehearsals
Comment: /pj-rehearse more to run up to 10 rehearsals
Comment: /pj-rehearse max to run up to 25 rehearsals
Comment: /pj-rehearse auto-ack to run up to 5 rehearsals, and add the rehearsals-ack label on success
Comment: /pj-rehearse list to get an up-to-date list of affected jobs
Comment: /pj-rehearse abort to abort all active rehearsals
Comment: /pj-rehearse network-access-allowed to allow rehearsals of tests that have the restrict_network_access field set to false. This must be executed by an openshift org member who is not the PR author

Once you are satisfied with the results of the rehearsals, comment: /pj-rehearse ack to unblock merge. When the rehearsals-ack label is present on your PR, merge will no longer be blocked by rehearsals.
If you would like the rehearsals-ack label removed, comment: /pj-rehearse reject to re-block merging.

@dustymabe
Copy link
Member

/lgtm

@openshift-ci openshift-ci bot added the lgtm Indicates that a PR is ready to be merged. label Feb 13, 2026
@cverna
Copy link
Contributor Author

cverna commented Feb 19, 2026

/shrug

@cverna
Copy link
Contributor Author

cverna commented Feb 19, 2026

/approve

@openshift-ci openshift-ci bot added the ¯\_(ツ)_/¯ ¯\\\_(ツ)_/¯ label Feb 19, 2026
@cverna
Copy link
Contributor Author

cverna commented Feb 19, 2026

/pj-rehearse ack

@openshift-ci-robot
Copy link
Contributor

@cverna: now processing your pj-rehearse request. Please allow up to 10 minutes for jobs to trigger or cancel.

@openshift-ci-robot openshift-ci-robot added the rehearsals-ack Signifies that rehearsal jobs have been acknowledged label Feb 19, 2026
@openshift-ci
Copy link
Contributor

openshift-ci bot commented Feb 19, 2026

[APPROVALNOTIFIER] This PR is APPROVED

This pull-request has been approved by: cverna, dustymabe

The full list of commands accepted by this bot can be found here.

The pull request process is described here

Details Needs approval from an approver in each of these files:

Approvers can indicate their approval by writing /approve in a comment
Approvers can cancel approval by writing /approve cancel in a comment

@cverna
Copy link
Contributor Author

cverna commented Feb 19, 2026

/pj-rehearse pull-ci-openshift-os-master-images pull-ci-openshift-os-master-e2e-aws

@openshift-ci-robot
Copy link
Contributor

@cverna: now processing your pj-rehearse request. Please allow up to 10 minutes for jobs to trigger or cancel.

@openshift-merge-bot openshift-merge-bot bot merged commit 6f4fea8 into openshift:main Feb 19, 2026
13 of 15 checks passed
@openshift-ci
Copy link
Contributor

openshift-ci bot commented Feb 19, 2026

@cverna: The following test failed, say /retest to rerun all failed tests or /retest-required to rerun all mandatory failed tests:

Test name Commit Details Required Rerun command
ci/rehearse/openshift/os/master/images 8a0a7d8 link unknown /pj-rehearse pull-ci-openshift-os-master-images

Full PR test history. Your PR dashboard.

Details

Instructions for interacting with me using PR comments are available here. If you have questions or suggestions related to my behavior, please file an issue against the kubernetes-sigs/prow repository. I understand the commands that are listed here.

bryan-cox pushed a commit to bryan-cox/release that referenced this pull request Feb 19, 2026
…openshift#74887)

Update the dockerfile_path for rhel-coreos-extensions from
extensions/Dockerfile to extensions/Containerfile to match the
rename in openshift/os#1896

Assisted-by: OpenCode (Opus 4.5)
theautoroboto pushed a commit to theautoroboto/release that referenced this pull request Feb 19, 2026
…openshift#74887)

Update the dockerfile_path for rhel-coreos-extensions from
extensions/Dockerfile to extensions/Containerfile to match the
rename in openshift/os#1896

Assisted-by: OpenCode (Opus 4.5)
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

approved Indicates a PR has been approved by an approver from all required OWNERS files. lgtm Indicates that a PR is ready to be merged. rehearsals-ack Signifies that rehearsal jobs have been acknowledged ¯\_(ツ)_/¯ ¯\\\_(ツ)_/¯

Projects

None yet

Development

Successfully merging this pull request may close these issues.

3 participants